盾构隧道开挖面稳定的可靠度研究 被引量:15

Research on reliability of excavation face stability in shield tunneling
在线阅读 下载PDF
导出
摘要 目前,盾构隧道开挖面稳定性评价方法均是确定性方法。为了考虑土体参数的变异性,提出用可靠方法来评价其稳定程度。采用数值模拟方法,研究了隧道开挖面极限支护压力。基于BP神经网络预测大量给定地层参数工况下的开挖面极限支护压力,对其进行统计,得其概率分布特征。在理论分析的基础上,结合工程实际,探讨了盾构施工土压力的确定原理。建立了隧道开挖面稳定的极限状态方程,对其进行了可靠度分析。该研究除能够科学、合理地评价开挖面的稳定程度外,对于盾构施工过程中合理地设定开挖面支护压力也具有一定的参考作用。 Research methods for excavation face stability in shield tunneling are deterministic methods at present.In order to account the variability of soil parameters,reliability method to assess tunnel excavation face stability is proposed.Limit support pressure at excavation face of shield tunneling is studied with numerical simulation.Limit support pressures with different soil parameter samples are forecasted by BP neural network.Then the probability distribution of them is gained.Principle of determining the earth pressure during tunnel excavation by use of earth pressure balance shield machine is discussed theoretically and practically.Limit state equation of excavation face stability in shield tunneling is established.Excavation face stability is calculated with reliability method.The work not only can assess excavation face stability rationally,but also is significance to determine the support pressure scientifically.
作者 李志华 华渊 周太全 孙秀丽 LI Zhi-hua;HUA Yuan;ZHOU Tai-quan;SUN Xiu-li(School of Environmental and Civil Engineering,Jiangnan University,Wuxi 214122,China)
出处 《岩土力学》 EI CAS CSCD 北大核心 2008年第S01期315-319,共5页 Rock and Soil Mechanics
关键词 盾构隧道 开挖面 稳定性 可靠度 shield tunnel excavation face stability reliability
作者简介 李志华,男,1976年生,工学博士,主要从事隧道施工力学、可靠度评估方面的教学和研究工作。E-mail:lizhhdlut@yahoo.com.cn
  • 相关文献

参考文献4

二级参考文献24

  • 1朱伟,秦建设,卢廷浩.砂土中盾构开挖面变形与破坏数值模拟研究[J].岩土工程学报,2005,27(8):897-902. 被引量:118
  • 2朱伟 陈仁俊.盾构隧道施工技术现状及展望(第3讲).Ceotechnical Engineering World,2001.
  • 3Chambon, P. and Corte, J.F., " Shallow tunnels in cohesionless soil: Stability of tunnel face," [ J ]. Journal of-Geotechnical Engineering, American Society Civil Engineers, Vol. 120, pp. 1148-1165,1994.
  • 4Romo, M.P. and Diaz, C.M., "Face stability and Ground settlement in Shield Tunneling," [ C ]. Proc. Of the 10th Int'l Conf. on Soil Mechanics and Foundation Engineering,Vol. 1, Stockholm, pp.357 - 360,1981.
  • 5E.H. Davis, M.J. Gunn, R.J. Malt, and H.N. Seneviratne, "The stability of shallow tunnel sand underground openings in cohesive material." [ J ]. Geotetechnical, 30(4) :397 -416, 1980.
  • 6G. Anagnostou and K. Kovarl [ J ]. "Tuneling and Underground Space Technology," Vol. 11, No. 2. 165 - 173,1996.
  • 7Pierre Chambon Chambon, "Shallow tunnels in cohesionless soil:Stabillty of tunnel face,"[J] . Journal of Geotechnical Engineering, Vol. 120, No. 7,1994.
  • 8P. de Buhan, A. Cuvillier, L. Dormieux, and S. Maghous, "Face stability of shallow circular tunnels driven under the water table: A numerical analysis,"[ J]. International Journal for Numerical and Analytical Methods in Geomechanics, 23:79 - 95, 1999.
  • 9Stallebrass S E,Grant R J,Taylor R N.A Finite element study of ground movements measured in centrifuge model tests of tunnels[C]//Geotechnical Aspects of Underground Construction in Soft Ground.Balkema:Rotterdam,1996
  • 10Duncan J M.State of the art:Limit equilibrium and finite element analysis of slopes[J].Journal of Geotechnical Engineering,ASCE,1996,122 (7):577-596

共引文献155