Capacitor-based pulsed power supply(PPS)is widely used in fields related to electromagnetic launch,plasma,and materials'synthesis,modification and processing.As industrial applications place higher requirements on...Capacitor-based pulsed power supply(PPS)is widely used in fields related to electromagnetic launch,plasma,and materials'synthesis,modification and processing.As industrial applications place higher requirements on compact and portable pulsed power supplies,the National Key Laboratory of Transient Physics(NKLTP)recently developed a pulsed power supply consisting of a set of compact pulse-forming units(PFU),each with a capacitor energy storage of 220 kJ.This integrated PPS comes with a complete system configuration,a miniature compact structure,a high rate of repetition,and high power,with energy storage density exceeding 1.2 MJ/m^(3).This paper describes the device-level design of the unit,the system layout,the control system,the thermal management system,and the experimental results of the pulsed power supply.The experimental results verified the good reliability of the PPS at high repetition rates with each unit module delivering an output current of more than 100 kA.Additionally,flexible current pulse shapes can be formed by setting the charging voltage and the trigger sequence of the PFUs.The pulse forming network(PFN)developed from these PFUs was successfully applied to electromagnetic launch.展开更多
Based on our previous pulsed current and internal overvoltage test data and the experience of common commercial high power cables,a 100 kA coaxial pulsed power cable is designed and manufactured to adapt the coaxial e...Based on our previous pulsed current and internal overvoltage test data and the experience of common commercial high power cables,a 100 kA coaxial pulsed power cable is designed and manufactured to adapt the coaxial electric energy breech transmission between the plasma generator and the pulsed power supply(PPS) in electrothermal-chemical(ETC) guns.The index parameters are analyzed and determined.Semi-conductor layers and a shield stiffener are introduced to prevent the deformation and burst of the pulsed power cable structurally.The semi-conductor layer can eliminate the air gap and balance the electric field in the cable.The shield stiffener can multiply the mechanical strength to restrain the strong electrodynamic force produced by the core dislocation of the outer conductor.The multi-coupling of electromagnetic field,stress field and thermal field analysis are established to assist in aided design of electrical strength,mechanical strength and temperature rise characteristics.Both a DC voltage withstand test and pulsed discharge tests are introduced to verify and inspect the performance and dynamic response of the pulsed power cable.The 25 kV/5 min DC voltage withstand test result shows that the sample leakage current is nearly 3 μA and no abnormal phenomena of the pulsed power cable sample occurred.The pulsed discharge tests show that the sample can sustain the 100 kA peak current.Furthermore,this 100 kA coaxial pulsed power cable can satisfy the ETC test requirements.展开更多
先进绝热压缩空气储能(advanced adiabatic compressed air energy storage,AA-CAES)具备天然的热电联供特性,能够有效缓解供热期出现的弃风问题。若能在规划阶段充分考虑运行需求,进而合理地配置储能容量,则能够在解决弃风问题的前提下...先进绝热压缩空气储能(advanced adiabatic compressed air energy storage,AA-CAES)具备天然的热电联供特性,能够有效缓解供热期出现的弃风问题。若能在规划阶段充分考虑运行需求,进而合理地配置储能容量,则能够在解决弃风问题的前提下,最大程度对燃煤机组进行清洁替代。为此,该文提出了多热源协同互补的AA-CAES系统容量配置模型。首先本模型在能量输入端引入电锅炉预热压缩机入口空气,以增大压缩机输气系数并提高机组产热量;其次在扩展热源端,通过太阳能反射镜场收集光热,以提高系统储热水平;并在计及储能系统各模块实际运行效率约束之余,以运行总成本最小为目标,计算储能容量配置最优解。再次,分析供热时长及环境温度等因素对投资成本回收年限的影响,并计算不同情况下本模型投资成本的回收年限,得出建设本模型可盈利的硬性条件;最后,基于东北某地区供热期及非供热期典型日负荷及气象数据在IEEE-39节点系统完成算例分析,验证所提模型有效性。展开更多
基金financial support from the National Key Laboratory of Transient Physics,Nanjing University of Science and Technology(Grant No.6142604230101)Postgraduate Research&Practice Innovation Program of Jiangsu Province,China(Grant Nos.KYCX20_0321 and KYCX20_0322).
文摘Capacitor-based pulsed power supply(PPS)is widely used in fields related to electromagnetic launch,plasma,and materials'synthesis,modification and processing.As industrial applications place higher requirements on compact and portable pulsed power supplies,the National Key Laboratory of Transient Physics(NKLTP)recently developed a pulsed power supply consisting of a set of compact pulse-forming units(PFU),each with a capacitor energy storage of 220 kJ.This integrated PPS comes with a complete system configuration,a miniature compact structure,a high rate of repetition,and high power,with energy storage density exceeding 1.2 MJ/m^(3).This paper describes the device-level design of the unit,the system layout,the control system,the thermal management system,and the experimental results of the pulsed power supply.The experimental results verified the good reliability of the PPS at high repetition rates with each unit module delivering an output current of more than 100 kA.Additionally,flexible current pulse shapes can be formed by setting the charging voltage and the trigger sequence of the PFUs.The pulse forming network(PFN)developed from these PFUs was successfully applied to electromagnetic launch.
基金supported by the United Foundation of China Ordnance Industry(Grant No.6141B010220)
文摘Based on our previous pulsed current and internal overvoltage test data and the experience of common commercial high power cables,a 100 kA coaxial pulsed power cable is designed and manufactured to adapt the coaxial electric energy breech transmission between the plasma generator and the pulsed power supply(PPS) in electrothermal-chemical(ETC) guns.The index parameters are analyzed and determined.Semi-conductor layers and a shield stiffener are introduced to prevent the deformation and burst of the pulsed power cable structurally.The semi-conductor layer can eliminate the air gap and balance the electric field in the cable.The shield stiffener can multiply the mechanical strength to restrain the strong electrodynamic force produced by the core dislocation of the outer conductor.The multi-coupling of electromagnetic field,stress field and thermal field analysis are established to assist in aided design of electrical strength,mechanical strength and temperature rise characteristics.Both a DC voltage withstand test and pulsed discharge tests are introduced to verify and inspect the performance and dynamic response of the pulsed power cable.The 25 kV/5 min DC voltage withstand test result shows that the sample leakage current is nearly 3 μA and no abnormal phenomena of the pulsed power cable sample occurred.The pulsed discharge tests show that the sample can sustain the 100 kA peak current.Furthermore,this 100 kA coaxial pulsed power cable can satisfy the ETC test requirements.
文摘先进绝热压缩空气储能(advanced adiabatic compressed air energy storage,AA-CAES)具备天然的热电联供特性,能够有效缓解供热期出现的弃风问题。若能在规划阶段充分考虑运行需求,进而合理地配置储能容量,则能够在解决弃风问题的前提下,最大程度对燃煤机组进行清洁替代。为此,该文提出了多热源协同互补的AA-CAES系统容量配置模型。首先本模型在能量输入端引入电锅炉预热压缩机入口空气,以增大压缩机输气系数并提高机组产热量;其次在扩展热源端,通过太阳能反射镜场收集光热,以提高系统储热水平;并在计及储能系统各模块实际运行效率约束之余,以运行总成本最小为目标,计算储能容量配置最优解。再次,分析供热时长及环境温度等因素对投资成本回收年限的影响,并计算不同情况下本模型投资成本的回收年限,得出建设本模型可盈利的硬性条件;最后,基于东北某地区供热期及非供热期典型日负荷及气象数据在IEEE-39节点系统完成算例分析,验证所提模型有效性。