The swinging-loading process is essential for automatic artillery loading systems.This study focuses on the problems of reliability analysis that affect swinging-loading positioning accuracy.A dynamic model for a mult...The swinging-loading process is essential for automatic artillery loading systems.This study focuses on the problems of reliability analysis that affect swinging-loading positioning accuracy.A dynamic model for a multi degree-of-freedom swinging-loading-integrated rigid-flexible coupling system is established.This model is based on the identification of key parameters and platform experiments.Based on the spatial geometric relationship between the breech and loader during modular charge transfer and the possible maximum interference depth of the modular charge,a new failure criterion for estimating the reliability of swinging-loading positioning accuracy is proposed.Considering the uncertainties in the operation of the pendulum loader,the direct probability integration method is introduced to analyze the reliability of the swinging-loading positioning accuracy under three different charge numbers.The results indicate that under two and four charges,the swinging-loading process shows outstanding reliability.However,an unstable stage appears when the swinging motion occurred under six charges,with a maximum positioning failure probability of 0.0712.A comparison between the results obtained under the conventional and proposed criteria further reveals the effectiveness and necessity of the proposed criterion.展开更多
针对民用机场场道水泥混凝土道面在建设施工中检测指标满足施工质量验收规范的前提下仍然存在安全隐患的问题,基于建筑信息模型(building information model,BIM)平台构建的三维地质及场道数字模型,在平台数据管理模块中提取当前施工结...针对民用机场场道水泥混凝土道面在建设施工中检测指标满足施工质量验收规范的前提下仍然存在安全隐患的问题,基于建筑信息模型(building information model,BIM)平台构建的三维地质及场道数字模型,在平台数据管理模块中提取当前施工结构层的可靠性分析数据,耦合机场混凝土道面设计参数作为未施工结构层的已知参数,并结合可靠度分析理论和结构抗力-应力效应概率模型,建立场道质量动态可靠性分析模型,对施工质量进行二次检验,最后对该方法进行了实际验证。研究结果显示:可以得到当前施工状态对整个场道工程可靠性的影响,实现了道面可靠性动态分析。根据分析反馈,及时进行现场施工调整是提高场道工程质量的重要举措。展开更多
文摘The swinging-loading process is essential for automatic artillery loading systems.This study focuses on the problems of reliability analysis that affect swinging-loading positioning accuracy.A dynamic model for a multi degree-of-freedom swinging-loading-integrated rigid-flexible coupling system is established.This model is based on the identification of key parameters and platform experiments.Based on the spatial geometric relationship between the breech and loader during modular charge transfer and the possible maximum interference depth of the modular charge,a new failure criterion for estimating the reliability of swinging-loading positioning accuracy is proposed.Considering the uncertainties in the operation of the pendulum loader,the direct probability integration method is introduced to analyze the reliability of the swinging-loading positioning accuracy under three different charge numbers.The results indicate that under two and four charges,the swinging-loading process shows outstanding reliability.However,an unstable stage appears when the swinging motion occurred under six charges,with a maximum positioning failure probability of 0.0712.A comparison between the results obtained under the conventional and proposed criteria further reveals the effectiveness and necessity of the proposed criterion.
文摘针对民用机场场道水泥混凝土道面在建设施工中检测指标满足施工质量验收规范的前提下仍然存在安全隐患的问题,基于建筑信息模型(building information model,BIM)平台构建的三维地质及场道数字模型,在平台数据管理模块中提取当前施工结构层的可靠性分析数据,耦合机场混凝土道面设计参数作为未施工结构层的已知参数,并结合可靠度分析理论和结构抗力-应力效应概率模型,建立场道质量动态可靠性分析模型,对施工质量进行二次检验,最后对该方法进行了实际验证。研究结果显示:可以得到当前施工状态对整个场道工程可靠性的影响,实现了道面可靠性动态分析。根据分析反馈,及时进行现场施工调整是提高场道工程质量的重要举措。