To improve the mainlainability design efficiency and quality, a layout optimization method for maintainability of multi-component systems was proposed. The impact of the component layout design on system maintainabili...To improve the mainlainability design efficiency and quality, a layout optimization method for maintainability of multi-component systems was proposed. The impact of the component layout design on system maintainability was analyzed, and the layout problem for maintainability was presented. It was formulated as an optimization problem, where maintainability, layout space and distance requirement were formulated as objective functions. A multi-objective particle swarm optimization algorithm, in which the constrained-domination relationship and the update strategy of the global best were simply modified, was then used to obtain Pareto optimal solutions for the maintainability layout design problem. Finally, application in oxygen generation system of a spacecraft was studied in detail to illustrate the effectiveness and usefulness of the proposed method. The results show that the concurrent maintainability design can be carried out during the layout design process by solving the layout optimization problem for maintainability.展开更多
Although opportunistic maintenance strategies are widely used for multi-component systems, all opportunistic mainte- nance strategies only consider economic dependence and do not take structural dependence into accoun...Although opportunistic maintenance strategies are widely used for multi-component systems, all opportunistic mainte- nance strategies only consider economic dependence and do not take structural dependence into account. An opportunistic main- tenance strategy is presented for a multi-component system that considers both structural dependence and economic dependence. The cost relation and time relation among components based on structural dependence are developed. The maintenance strategy for each component of a multi-component system involves one of five maintenance actions, namely, no-maintenance, a minimal maintenance action, an imperfect maintenance action, a perfect maintenance action, and a replacement action. The maintenance action is determined by the virtual age of the component, the life expectancy of the component, and the age threshold values. Monte Carlo simulation is designed to obtain the optimal oppor- tunistic maintenance strategy of the system over its lifetime. The simulation result reveals that the minimum maintenance cost with a strategy that considers structural dependence is less than that with a strategy that does not consider structural dependence. The availability with a strategy that considers structural dependence is greater than that with a strategy that does not consider structural dependence under the same conditions.展开更多
For unacceptable computational efficiency and accuracy on the probabilistic analysis of multi-component system with multi-failure modes,this paper proposed multi-extremum response surface method(MERSM).MERSM model was...For unacceptable computational efficiency and accuracy on the probabilistic analysis of multi-component system with multi-failure modes,this paper proposed multi-extremum response surface method(MERSM).MERSM model was established based on quadratic polynomial function by taking extremum response surface model as the sub-model of multi-response surface method.The dynamic probabilistic analysis of an aeroengine turbine blisk with two components,and their reliability of deformation and stress failures was obtained,based on thermal-structural coupling technique,by considering the nonlinearity of material parameters and the transients of gas flow,gas temperature and rotational speed.The results show that the comprehensive reliability of structure is 0.9904 when the allowable deformations and stresses of blade and disk are 4.78×10–3 m and 1.41×109 Pa,and 1.64×10–3 m and 1.04×109 Pa,respectively.Besides,gas temperature and rotating speed severely influence the comprehensive reliability of system.Through the comparison of methods,it is shown that the MERSM holds higher computational precision and speed in the probabilistic analysis of turbine blisk,and MERSM computational precision satisfies the requirement of engineering design.The efforts of this study address the difficulties on transients and multiple models coupling for the dynamic probabilistic analysis of multi-component system with multi-failure modes.展开更多
Aiming at wind turbines,the opportunistic maintenance optimization is carried out for multi-component system,where minimal repair,imperfect repair,replacement as well as their effects on component’s effective age are...Aiming at wind turbines,the opportunistic maintenance optimization is carried out for multi-component system,where minimal repair,imperfect repair,replacement as well as their effects on component’s effective age are considered.At each inspection point,appropriate maintenance mode is selected according to the component’s effective age and its maintenance threshold.To utilize the maintenance opportunities for the components among the wind turbines,opportunistic maintenance approach is adopted.Meanwhile,the influence of seasonal factor on the component’s failure rate and improvement factor’s decrease with the increase of repair’s times are also taken into account.The maintenance threshold is set as the decision variable,and an opportunistic maintenance optimization model is proposed to minimize wind turbine’s life-cycle maintenance cost.Moreover,genetic algorithm is adopted to solve the model,and the effectiveness is verified with a case study.The results show that based on the component’s inherent reliability and maintainability,the proposed model can provide optimal maintenance plans accordingly.Furthermore,the higher the component’s reliability and maintainability are,the less the times of repair and replacement will be.展开更多
Fig.1 3D X-ray tomography reconstruction and element distribution in Ti,Mg and Al co-doped LiCoO2.3D spatial distributions of (a) Al,(b) Co and (c) Ti probed by fluorescence-yield scanning transmission X-ray microscop...Fig.1 3D X-ray tomography reconstruction and element distribution in Ti,Mg and Al co-doped LiCoO2.3D spatial distributions of (a) Al,(b) Co and (c) Ti probed by fluorescence-yield scanning transmission X-ray microscopy;elemental distributions of (d) Al,(e) Co and (f) Ti over the virtual x-z slice through the center of the particle;(g) identified and visualized subdomain formation Fig.2 (a) Comparison of cycling stabilities of Ti,Mg and Al co-doped LiCoO2 and pristine LiCoO2 half cells,charge-discharge profiles of (b) pristine LiCoO2 and (c) Ti,Mg and Al co-doped LiCoO2 half cells,(d) cycle stabilities of Ti,Mg and Al co-doped LiCoO2 and pristine LiCoO2 full batteries (graphite was used anode) and (e) discharge voltage of the full batteries and energy density of the both materials as a function of cycle number Layered lithium cobalt oxide (LiCoO2) with a theoretical capacity of 274 mAh·g^-1 has become a dominant cathode material for lithium-ion batteries of “3C” market (cellular phones,portable computers,camcorders)[1-2].Nevertheless,the actually attained capacity is merely about 140 mAh·g^-1 with a charge cut-off vol- tage of about 4.2 V (vs Li +/Li)[3].展开更多
During extended warranty(EW)period,maintenance events play a key role in controlling the product systems within normal operations.However,the modelling of failure process and maintenance optimization is complicated ow...During extended warranty(EW)period,maintenance events play a key role in controlling the product systems within normal operations.However,the modelling of failure process and maintenance optimization is complicated owing to the complex features of the product system,namely,components of the multi-component system are interdependent with each other in some form.For the purpose of optimizing the EW pricing decision of the multi-component system scientifically and rationally,taking the series multi-component system with economic dependence sold with EW policy as a research object,this paper optimizes the imperfect preventive maintenance(PM)strategy from the standpoint of EW cost.Taking into consideration adjusting the PM moments of the components in the system,a group maintenance model is developed,in which the system is repaired preventively in accordance with a specified PM base interval.In order to compare with the system EW cost before group maintenance,the system EW cost model before group maintenance is developed.Numerical example demonstrates that offering group maintenance programs can reduce EW cost of the system to a great extent,thereby reducing the EW price,which proves to be a win-win strategy to manufacturers and users.展开更多
基金Project(51005238)supported by the National Natural Science Foundation of China
文摘To improve the mainlainability design efficiency and quality, a layout optimization method for maintainability of multi-component systems was proposed. The impact of the component layout design on system maintainability was analyzed, and the layout problem for maintainability was presented. It was formulated as an optimization problem, where maintainability, layout space and distance requirement were formulated as objective functions. A multi-objective particle swarm optimization algorithm, in which the constrained-domination relationship and the update strategy of the global best were simply modified, was then used to obtain Pareto optimal solutions for the maintainability layout design problem. Finally, application in oxygen generation system of a spacecraft was studied in detail to illustrate the effectiveness and usefulness of the proposed method. The results show that the concurrent maintainability design can be carried out during the layout design process by solving the layout optimization problem for maintainability.
基金supported by the Postdoctoral Science Foundation of China(20080431380)
文摘Although opportunistic maintenance strategies are widely used for multi-component systems, all opportunistic mainte- nance strategies only consider economic dependence and do not take structural dependence into account. An opportunistic main- tenance strategy is presented for a multi-component system that considers both structural dependence and economic dependence. The cost relation and time relation among components based on structural dependence are developed. The maintenance strategy for each component of a multi-component system involves one of five maintenance actions, namely, no-maintenance, a minimal maintenance action, an imperfect maintenance action, a perfect maintenance action, and a replacement action. The maintenance action is determined by the virtual age of the component, the life expectancy of the component, and the age threshold values. Monte Carlo simulation is designed to obtain the optimal oppor- tunistic maintenance strategy of the system over its lifetime. The simulation result reveals that the minimum maintenance cost with a strategy that considers structural dependence is less than that with a strategy that does not consider structural dependence. The availability with a strategy that considers structural dependence is greater than that with a strategy that does not consider structural dependence under the same conditions.
基金Projects (51275138,51605016) supported by the National Natural Science Foundation of ChinaProject (12531109) supported by the Science Foundation of Heilongjiang Provincial Department of Education,ChinaProject supported by Research Start-up Funding of Fudan University,China
文摘For unacceptable computational efficiency and accuracy on the probabilistic analysis of multi-component system with multi-failure modes,this paper proposed multi-extremum response surface method(MERSM).MERSM model was established based on quadratic polynomial function by taking extremum response surface model as the sub-model of multi-response surface method.The dynamic probabilistic analysis of an aeroengine turbine blisk with two components,and their reliability of deformation and stress failures was obtained,based on thermal-structural coupling technique,by considering the nonlinearity of material parameters and the transients of gas flow,gas temperature and rotational speed.The results show that the comprehensive reliability of structure is 0.9904 when the allowable deformations and stresses of blade and disk are 4.78×10–3 m and 1.41×109 Pa,and 1.64×10–3 m and 1.04×109 Pa,respectively.Besides,gas temperature and rotating speed severely influence the comprehensive reliability of system.Through the comparison of methods,it is shown that the MERSM holds higher computational precision and speed in the probabilistic analysis of turbine blisk,and MERSM computational precision satisfies the requirement of engineering design.The efforts of this study address the difficulties on transients and multiple models coupling for the dynamic probabilistic analysis of multi-component system with multi-failure modes.
基金Project(71671035)supported by the National Natural Science Foundation of ChinaProjects(ZK15-03-01,ZK16-03-07)supported by Open Fund of Jiangsu Wind Power Engineering Technology Center of China
文摘Aiming at wind turbines,the opportunistic maintenance optimization is carried out for multi-component system,where minimal repair,imperfect repair,replacement as well as their effects on component’s effective age are considered.At each inspection point,appropriate maintenance mode is selected according to the component’s effective age and its maintenance threshold.To utilize the maintenance opportunities for the components among the wind turbines,opportunistic maintenance approach is adopted.Meanwhile,the influence of seasonal factor on the component’s failure rate and improvement factor’s decrease with the increase of repair’s times are also taken into account.The maintenance threshold is set as the decision variable,and an opportunistic maintenance optimization model is proposed to minimize wind turbine’s life-cycle maintenance cost.Moreover,genetic algorithm is adopted to solve the model,and the effectiveness is verified with a case study.The results show that based on the component’s inherent reliability and maintainability,the proposed model can provide optimal maintenance plans accordingly.Furthermore,the higher the component’s reliability and maintainability are,the less the times of repair and replacement will be.
文摘Fig.1 3D X-ray tomography reconstruction and element distribution in Ti,Mg and Al co-doped LiCoO2.3D spatial distributions of (a) Al,(b) Co and (c) Ti probed by fluorescence-yield scanning transmission X-ray microscopy;elemental distributions of (d) Al,(e) Co and (f) Ti over the virtual x-z slice through the center of the particle;(g) identified and visualized subdomain formation Fig.2 (a) Comparison of cycling stabilities of Ti,Mg and Al co-doped LiCoO2 and pristine LiCoO2 half cells,charge-discharge profiles of (b) pristine LiCoO2 and (c) Ti,Mg and Al co-doped LiCoO2 half cells,(d) cycle stabilities of Ti,Mg and Al co-doped LiCoO2 and pristine LiCoO2 full batteries (graphite was used anode) and (e) discharge voltage of the full batteries and energy density of the both materials as a function of cycle number Layered lithium cobalt oxide (LiCoO2) with a theoretical capacity of 274 mAh·g^-1 has become a dominant cathode material for lithium-ion batteries of “3C” market (cellular phones,portable computers,camcorders)[1-2].Nevertheless,the actually attained capacity is merely about 140 mAh·g^-1 with a charge cut-off vol- tage of about 4.2 V (vs Li +/Li)[3].
基金supported by the National Natural Science Foundation of China(71871219).
文摘During extended warranty(EW)period,maintenance events play a key role in controlling the product systems within normal operations.However,the modelling of failure process and maintenance optimization is complicated owing to the complex features of the product system,namely,components of the multi-component system are interdependent with each other in some form.For the purpose of optimizing the EW pricing decision of the multi-component system scientifically and rationally,taking the series multi-component system with economic dependence sold with EW policy as a research object,this paper optimizes the imperfect preventive maintenance(PM)strategy from the standpoint of EW cost.Taking into consideration adjusting the PM moments of the components in the system,a group maintenance model is developed,in which the system is repaired preventively in accordance with a specified PM base interval.In order to compare with the system EW cost before group maintenance,the system EW cost model before group maintenance is developed.Numerical example demonstrates that offering group maintenance programs can reduce EW cost of the system to a great extent,thereby reducing the EW price,which proves to be a win-win strategy to manufacturers and users.