期刊文献+

Comparing the Cost and Time of Tender Opening Committee Report Preparation for Manual and E-Procurement Tenders in the Roads and Highways Department of Bangladesh

Comparing the Cost and Time of Tender Opening Committee Report Preparation for Manual and E-Procurement Tenders in the Roads and Highways Department of Bangladesh
在线阅读 下载PDF
导出
摘要 Bangladesh’s public procurement system has been traditional, i.e., a manual tendering system, under the legislative guidance of PPA-2006 and PPR-2008. Manual tendering has long been a source of concern for public procurement agencies regarding tender opening related to cost and time. To resolve this challenge and make the dream of a Digital Bangladesh a reality, the Government of Bangladesh launched the e-Procurement system in 2011 under the flagship of e-GP Guidelines. Following the successful pilot testing conducted under the umbrella of the CPTU, all public PEs are attempting to implement electronic procurement tenders. This study aims to examine the cost and time involved in preparing Tender Opening Committee (TOC) Reports for manual and e-procurement tenders in Bangladesh’s Roads and Highways Department. A mixed-method was used to collect data from the population of 11 RHD zones, including KII and primarily survey questionnaires. The independent samples t-test was used to compare data and hypothesis tests from two groups using SPSS software. The results indicated that e-Procurement tendering, tender opening preparation costs and time were more efficient than manual tendering. Academicians, students, practitioners, researchers, and policymakers will benefit from the study’s conclusions. Additionally, the government will be urged to improve policies such as the PPA 2006, the PPR 2008, and the 2011 e-GP Guideline. Bangladesh’s public procurement system has been traditional, i.e., a manual tendering system, under the legislative guidance of PPA-2006 and PPR-2008. Manual tendering has long been a source of concern for public procurement agencies regarding tender opening related to cost and time. To resolve this challenge and make the dream of a Digital Bangladesh a reality, the Government of Bangladesh launched the e-Procurement system in 2011 under the flagship of e-GP Guidelines. Following the successful pilot testing conducted under the umbrella of the CPTU, all public PEs are attempting to implement electronic procurement tenders. This study aims to examine the cost and time involved in preparing Tender Opening Committee (TOC) Reports for manual and e-procurement tenders in Bangladesh’s Roads and Highways Department. A mixed-method was used to collect data from the population of 11 RHD zones, including KII and primarily survey questionnaires. The independent samples t-test was used to compare data and hypothesis tests from two groups using SPSS software. The results indicated that e-Procurement tendering, tender opening preparation costs and time were more efficient than manual tendering. Academicians, students, practitioners, researchers, and policymakers will benefit from the study’s conclusions. Additionally, the government will be urged to improve policies such as the PPA 2006, the PPR 2008, and the 2011 e-GP Guideline.
作者 Md. Abdur Rashid Mohammad Shorif Uddin Md. Abdur Rashid;Mohammad Shorif Uddin(Bangladesh University of Professionals, Dhaka, Bangladesh;Department of Computer Science and Engineering, Jahangirnagar University, Savar, Bangladesh)
出处 《Open Journal of Applied Sciences》 2022年第3期336-345,共10页 应用科学(英文)
关键词 e-GP Guideline 2011 E-PROCUREMENT Tender Opening Committee Report Preparation t-Test TOC Meeting e-GP Guideline 2011 e-Procurement Tender Opening Committee Report Preparation t-Test TOC Meeting
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部