摘要
对我省国产125MW机组通流部分改造后机组启动振动处理情况进行了详细论述,并对机组情况进行了评价,可供今后125MW机组改造参考之用。
Solution for vibration on 125MW steam turbine after retrofitting flow path in Zhejiang area is described in detail,the evaluation is also made in this paper,which can be supplied as references to the 125MW steam turbine to be improved in future.
出处
《热力透平》
2004年第1期66-68,71,共4页
Thermal Turbine