摘要 以新建天津至保定铁路天津段跨越西外环河及西外环特大桥主桥实际工程为背景,建立了该桥的整体有限元模型,并根据相关规范的要求,定义了五种荷载组合工况,计算分析了在结构自重、桥面铺装荷载、预应力荷载及混凝土收缩徐变效应基础上逐步增加风荷载、单线、双线及三线列车荷载后该桥的斜拉索应力,确定了斜拉索应力最大的荷载组合,对类似桥梁的设计、施工具有很好的参考价值。 In this paper,the whole bridge model was built with the new bridge which steps over the Xiwaihuan river and the Xiwaihuan large bridge in Tianjin section of Tianjin to Baoding railway as the actual project background.According to the requirements of the relevant specification,five kinds of load combination conditions were defined.Based on the dead load of the low-pylon cable-stayed bridge,bridge deck pavement load,reinforced prestressed load and the effect of concrete shrinkage and creep,the author calculated and analyzed the cable stress of this bridge by gradually increasing the wind load,single train load,double lines train load,three lines train load.And then the stress of the largest cable load combination was determined.It has good reference value to the design and construction of similar bridges.
作者 王金海
出处 《施工技术》 CAS 北大核心 2014年第S1期295-299,共5页 Construction Technology
关键词 桥梁工程 铁路 矮塔斜拉桥 有限元分析 应力 bridges railway low-pylon cable-stayed bridge finite element analysis stress
  • 相关文献

参考文献9

二级参考文献58

共引文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部