国产125MW汽轮发电机组整组起动调试可靠性增长分析

ANALYSIS OF RELIABILITY-ENHANCING IN START-UP COMMISSIONING OF A COMPLETE HOME-MADE 125MW TURBO-GENERATOR SET
在线阅读 下载PDF
导出
摘要 以可靠性增长试验的观点 ,分析了某电厂 12 5MW 1号机组整组起动调试中故障原因及统计数据。指出在调试过程中由于不断暴露问题并加以解决 ,整台机组的可靠性水平显著增长 ,但直至移交试生产 ,不考虑机组维修的狭义可靠性指标仍然较低。给出了机组可靠性增长AMSAA模型的点估计 ,并利用其进行了预测分析。分析结果实践表明是正确的。 From the view point of reliability-enhancing test, the causes of faults and statistic data in start-up commissioning of a complete 125MW unit in one power plant have been analysed. It has been pointed out that the reliability of unit NO.1 enhanced obviously during the time of start-up commissioning because of successively appeared problems having been solved one after another. But the reliability index in narrow sense without considering maintenance of units still remains at a low level until hand-over to trial production. The point estimation of a reliability-enhancing AMSAA model is given, and some forcast analyses having been carried out by using the said model. The results of analyses show, the practice being correct.
出处 《热力发电》 CAS 北大核心 2003年第7期7-9,23,共4页 Thermal Power Generation
  • 相关文献

参考文献8

二级参考文献27

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部