摘要
文章结合天津市某基坑工程实例,介绍了插筋水泥搅拌桩的设计、施工要点和改进措施。指出:建设、设计、施工单位共同加强对4~6m浅基坑的重视,是保证此类基坑成功的关键。
Based on a foundation excavation project in Tianjin,the paper presents an introduction to the designs,major points of construction and measures for improvement of the cement mixing piles with inserted steel reinforcementIt is pointed out that attaching great importance jointly by the Employer,the Designer and the Contractor to shallow foundation pits from 4 m to 6 m is the key to ensure the successful completion of such projects
出处
《中国港湾建设》
北大核心
2003年第2期40-42,共3页
China Harbour Engineering
关键词
水泥搅拌桩
基坑工程
支护
设计
施工
cement mixing pile
foundation excavation works
bracing
design
construction