摘要
结合太原地区某工程试桩检测实例,阐述了双套筒工艺在去除灌注桩空桩侧摩阻力中的应用,指出通过双套筒工艺能够直接测得有效桩长部分的单桩承载力,避免了空桩部分侧阻力对静载检测结果的影响。
Combining with the trial pile detection of some project in Taiyuan,the paper illustrates the application of the double socket craft in removing the side friction of the bored piles,and points out the double-socket pile can effectively measure the single pile loading capacity and avoid the influence of the side friction on the static detection.
出处
《山西建筑》
2016年第36期90-91,共2页
Shanxi Architecture
关键词
灌注桩
双套筒工艺
静载试验
空桩侧阻力
bored pile
double socket craft
static loading test
hollow pile's side friction