童庄河大桥南岸主墩钻孔平台承载力计算研究

Research on the Bearing Capacity Calculation of Drilling Platform for the Main Pieron the South Bank of Tongzhuang River Bridge
在线阅读 下载PDF
导出
摘要 在大桥施工过程中,平台作为承载施工设备、材料和人员的临时结构,起着至关重要的作用。在主墩钻孔平台的设计与计算中,平台设计的合理性直接影响工程的安全性与施工进度。文章通过理论计算,结合数值模拟,对大桥平台进行受力计算,最终确定该大桥的平台设计方案具备可行性,研究内容可为类似项目设计提供参考。 In the process of bridge construction,the plat-form plays a vital role as a temporary structure carrying construction equipment,materials and personnel.In the design and calculation of drilling platform for the main pier,the rationality of the platform design directly affects the safety and construction progress of the engineering.Through theoretical calculation and combined with nu-merical simulation,this paper calculates the force of the bridge platform,and finally determines that the platform design scheme of the bridge is feasible.The research con-tent can provide reference for similar project design.
作者 肖红 XIAO Hong(China Railway Construction Urban Construction Transportation Development Co.,Ltd.,Suzhou 215000,Jiangsu,China)
出处 《工程技术研究》 2025年第5期37-39,共3页 Engineering and Technological Research
关键词 桥梁平台 承载力计算 数值模拟 bridge platform bearing capacity calculation numerical simulation
作者简介 肖红,男,本科,工程师,研究方向为桥梁施工管理。