摘要
为全面改善南昌市水环境质量,在分析南昌市污水管网现状及问题的基础上,提出了排水管网整改的具体思路,并以东湖区排水管网综合改造为例进行方案探讨,通过开展新建设污水管网、雨污分流改造、老旧管网改造修复等多项工程,补齐雨污管网短板,基本实现南昌市污水全收集处理。
In order to comprehensively improve the water environment quality in Nanchang City,this paper analyzes the current situation and problems of the sewage pipeline network in Nanchang City,proposes specific ideas for the rectification of the drainage pipeline network,and takes the comprehensive renovation of the drainage pipeline network in Donghu District as an example to explore the plan.By carrying out multiple projects such as the construction of new sewage pipelines,the transformation of rainwater and sewage separation,and the renovation and repair of old pipelines,we have filled the gaps in the rainwater and sewage pipeline network,and basically achieved the full collection and treatment of sewage in Nanchang City.
作者
陈魁
CHEN Kui(Nanchang Donghu District Housing and Urban-Rural Construction Bureau,Nanchang 330006,China)
出处
《云南水力发电》
2025年第3期40-42,46,共4页
Yunnan Water Power
基金
国家自然科学基金项目(42061041)。
关键词
东湖区
排水管网
综合改造
建设方案
认识
Donghu District
drainage pipeline network
comprehensive renovation
construction plan
recognize
作者简介
陈魁(1983-),男,江西抚州人,助理工程师,主要从事市政建筑管理工作。