350MW超临界燃煤机组锅炉氧化皮治理方法研究

Oxygenation treatment of boiler furnace based on 350MW supercritical coal-fired unit Research on working methods
在线阅读 下载PDF
导出
摘要 加强机组启停过程管理,关注受热面氧化皮生成速率,结合机组启动初期,使用PCV阀吹扫氧化皮等预防方式,积极进行探索,做好机组停运期间的防磨防爆检查工作,防患于未然。应对电网负荷调度及机组顶尖峰等影响,克服机组负荷存在频繁快升快降变化导致的锅炉受热面爆管等问题。 Strengthen t he crew start-stop process control,pay attention to the rate of oxygenation of the skin on the heating surface.Initial start-up of the unit.Use the PCV'valve to purge the oxygenated skin and other precautionary methods.Actively explore.Do a good job of anti-wear and explosion-proof inspection during the shutdown period of the unit.Prevention is better than prevention.Should be affected by the load regulation of the grid and the peak of the unit peak,etc..The load of the server unit is frequent,rising and falling rapidly,and the heating surface of the boiler is bursting.
作者 陈延峰 CHEN Yanfeng(Beijing GD Power Co.,Ltd Dalian Development Area Co-Generation Power Plant,Dalian 116600,China)
出处 《锅炉制造》 2025年第1期25-27,共3页 Boiler Manufacturing
关键词 氧化皮 PCV阀吹扫 优化措施 oxidation skin PCV valve purging Optimization measures
作者简介 陈延峰(1986-),男,从事火力发电厂锅炉设备检修工作。