摘要
随着城市建设向高层化、复杂化方向发展,后浇带施工技术能够有效应对大型复杂结构的施工难题,市场需求将不断增加。然而,在实际施工中往往会遇到诸多问题,如养护时间短、后浇带内钢筋未能得到妥善保护、施工期间对区域施加过大的负载等。基于此,重点介绍了后浇带施工技术,对建筑项目施工中出现的问题进行调查研究,并提出解决方案。
With the development of urban construction towards higher and more complex directions,post-cast strip construction technology can effectively address the construction difficulties of large and complex structures,and market demand will continue to increase.However,in actual construction many problems are often encountered,such as short curing time,inadequate protection of steel bars in the post-cast strip,and excessive load applied to the area during construction.Based on this,this article focuses on the construction technology of post-cast strip,conduct investigation and research on the problems that arise during construction projects,and propose solutions.
作者
张林林
ZHANG Linlin(Jinan Construction Supervision Co.,Ltd.,Jinan,Shandong Province,250014 China)
出处
《大众科学》
2024年第15期65-67,共3页
China Public Science
关键词
后浇带施工技术
建筑工程
高层建筑
施工步骤
Post-cast strip construction technology
Construction engineering
High rise buildings
Construction steps
作者简介
张林林(1984-),男,本科,工程师,研究方向为建筑工程。