摘要
在地铁施工过程中,盾构机的应用比较普遍,出于保证施工质量、安全性的目的,需要加强盾构机转接始发技术管控。以地铁盾构法施工中盾构机转接始发技术特点为切入点,分别就盾构机始发技术、转接技术进行分析,包括技术流程、主要技术方法及施工要点等,清晰呈现地铁盾构法施工中盾构机转接始发技术内容,为其规范运用提供少许参考。
In the construction process of subways,the application of shield tunneling machines is quite common.In order to ensure construction quality and safety,it is necessary to strengthen the control of Starting technology of shield tunneling machine transfer.This article takes the characteristics of Starting technology of shield machine trans-fer in subway shield tunneling construction as the starting point,analyzes the shield machine Transfer technology and Starting technology,including technical processes,main technical methods,and construction points,and clearly presents the content of Starting technology of shield machine transfer in subway shield tunneling construction,pro-viding some reference for its standardized application.
作者
王光磊
WANG Guanglei(Urban Rail Engineering Co.,Ltd.,China Railway 11th Bureau Group Corporation Limited,Wuhan,Hubei Province,430074 China)
出处
《科技资讯》
2024年第18期151-153,共3页
Science & Technology Information
关键词
地铁施工
盾构法
盾构机
转接始发技术
Subway construction
Shield Tunneling method
Shield tunneling machine
Transfer Starting technology
作者简介
王光磊(1989-),男,本科,工程师,研究方向为城市轨道工程。