摘要 托梁拔柱技术设计难度大、施工复杂,施工过程中安全风险较高,因此尚未形成完整的托梁拔柱设计理论和施工技术。结合某金融大厦改造工程,对托梁拔柱实践进行探讨,该大厦项目拟拆除两根框架柱,依据功能布局的需求及相应的计算结果,采用新增简支预应力上翻梁的加固改造措施。从实施方案对比、可行性论证和现场监测验证等方面阐述了简支上翻梁的优越性,并详述托梁拔柱的施工方案。施工过程中框架梁监测点变形量在-4.6mm~2.5mm之间,大厦改造后可以满足预定的使用功能,可为同类型的工程提供参考。 The design of column removing and beam supporting technology is difficult,the construction is complex,and the safety risk in the construction process is high.Therefore,a complete design theory and construction technology of column removing and beam supporting has not yet been formed.Combined with the renovation project of a financial building,the practice of column removing and beam supporting is discussed.The building project plans to remove two frame columns.After the removal of the frame columns,according to the adjustment of the functional layout and the corresponding calculation results,new prestressed up-turning beams are adopted for reinforcement and reconstruction measures.Based on the analysis of implementation scheme comparison,feasibility demonstration and on-site monitoring verification,the simply supported up-turned prestressed transfer beam is finally verified to be a good method for this project,and the construction scheme of column removing and beam supporting is detailed.During the construction,the deformation of the monitoring point of the frame beam is between-4.6 mm and 2.5 mm.After the building is reconstructed,it can meet the predetermined normal function.The scheme can provide reference for the same type of projects.
作者 董建伟 李刚 王敬贺 孙雨生 牛功科 李锦 Dong Jian-wei;Li Gang;Wang Jing-he;Sun Yu-sheng;Niu Gong-ke;Li Jin(CABR TECH(Beijing)Structural Engineering Co.Ltd,Beijing 100013,China;China Academy of Building Research,Beijing 100013,China;Hainan Island Airport Industry Group Co.Ltd,Haikou 570100,China)
出处 《工程抗震与加固改造》 北大核心 2024年第4期156-163,共8页 Earthquake Resistant Engineering and Retrofitting
关键词 钢筋混凝土结构 托梁拔柱 预应力 上翻转换 加固改造 reinforced concrete structure column removing and beam supporting prestressing upward conversion reinforcement and reconstruction
作者简介 董建伟(1980-),男,高级工程师,研究方向:结构加固改造,E⁃mail:dongjianwei@cabrtech.com。
  • 相关文献

参考文献9

二级参考文献46

  • 1杨斌,李延和.建筑物鉴定与加固改造学科发展评述[J].泰州职业技术学院学报,2004,4(4):13-17. 被引量:2
  • 2陈志华,苗纪奎.方钢管混凝土柱-H型钢梁外肋环板节点研究[J].工业建筑,2005,35(10):61-63. 被引量:19
  • 3冉群,吴照海,李元东,戴志涛,田涌.某商住楼托梁拔柱施工[J].施工技术,2006,35(3):38-39. 被引量:7
  • 4KISHIT N, CHEN W F. Behavior of tall buildings with mixed use of rigid and semi rigid connections[J]. Computers and Structures, 1996, 61(6) :1193-1206.
  • 5GOTO YOSHIAKI. Valid of classification systems of semi-rigid connections [J]. Engineering Structures, 1995, 17(8):544-553.
  • 6Euro code 3: Design of Steel Structures: Part 1.1 Gener al Rules and Rules for Building, CEN[S]. Bruxelles: Commission of the European Communities, 1993.
  • 7BJORHOVDE R, COLSON A, BROZZETTI J. Classification system for beam-to-column connections[J]. Journal of Structural Engineering, ASCE, 1990, 116 (11):3059-3076.
  • 8Charles W ROEDER, Robert GRAFF, Jennifer SODER STROM et al. Seismic performance of pile-wharf connections [J]. Journal of Structural Engineering. 2005,3:428-437.
  • 9MAXWELL J M. Joints in Structural Steelwork[M]. Pentech Press, 1981.
  • 10TRAVIS P Green, ROBERTO T Leon, GIAN A Rassati. Bidirectional tests on partially restrained, composite beam-to-column connections [J]. Journal of Structural Engineering, 2004, 2:320-327.

共引文献29

同被引文献14

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部