摘要 兰州市北环线工程全长约22.5 km,1号桥上部结构采用钢桁架桥,为确保施工中钢桁架结构的安全,在研究桥梁施工技术方案的基础上,分析了施工监控的要点和难点,详细介绍了1号桁架桥施工中的施工监控技术,通过现场监测数据对高架桥施工进行技术把控,从而保证了桥梁施工安全。 The total length of Lanzhou North Ring Road Project is about 22.5km,and the upper structure of No.1 Bridge adopts a steel truss bridge.To ensure the safety of steel truss structures during construction,based on the study of bridge construction technology schemes,this paper analyzes the key points and difficulties of construction monitoring,and provides a detailed introduction to the construction monitoring technology in the construction of No.1 truss bridge.Through on-site monitoring data,technical control of elevated bridge construction is carried out to ensure bridge construction safety.
作者 李文华 LI Wenhua(Lanzhou Jiaotong University School of Civil Engineering,Lanzhou 730000,China;Lanzhou Jiaotong University Engineering Testing Co.,LTD.,Lanzhou 730000,China)
出处 《云南水力发电》 2024年第7期23-25,71,共4页 Yunnan Water Power
关键词 1号桥 施工方案 顶推风险 施工监控 数据分析 No.1 Bridge construction plan push risk construction monitoring data analysis
作者简介 李文华(1990-),男,甘肃定西人,工程师,主要从事地基基础和主体结构检测、桥梁检测等工作。
  • 相关文献

参考文献3

二级参考文献9

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部