为解决某露天煤矿剥离运输系统与运煤运输系统的交叉问题,以B立交工程位置为研究对象,选取适于该露天矿运输现状的立交工程方法,基于现场调研,以定量与定性结合方式确定了钢波纹管方案。为进一步提升露天矿的经济效益与开采效率,提出了3组钢波纹管方案,选取最适于该露天煤矿的钢波纹管优化方案。
In order to solve the cross phenomenon between the stripping transportation system and the coal transportation system in an open pit coal mine,through taking the location of the B interchange project as the research object,the study selects an interchange engineering method reasonable to the current transportation situation of the open pit;and determines corrugated pipe scheme under the combination of qualitative and quantitative analysis based on site investigation.In order to further improve the economic benefits and mining efficiency of the open pit mine,3 sets of steel bellows are proposed,and the optimal scheme for the steel bellows is selected.
作者
侯鹏
Hou Peng(Xiwan Open Pit Mine of Shaanxi Shenyan Coal Co.,LTD,Yulin 719000,China)
出处
《黑龙江科学》
2024年第10期76-79,83,共5页
Heilongjiang Science
关键词
露天立交工程
钢波纹管
运输系统优化
交叉运输
Open-air interAchange project
Steel bellows
Transportation system optimization
Cross transport