摘要
为了分析低水头、日调节或径流式水电站的出力情况,研究适用于水电站的发电调度运行方式曲线,笔者研究分析折线形和山峰形两种出力限制曲线,对两种曲线合理性进行分析和验证,并提出应用建议。结果表明,两种曲线均可以大幅提高水电站及电网调度对短期(日内)预想出力的预测精度。两种曲线均可适用于低水头、径流式水电站在不同水头条件的调度需求,有一定借鉴意义。
In order to analyze the output of low head daily regulation or run-of-river hydropower station and study the operation mode curve of power generation scheduling suitable for hydropower stations the authors study and analyze two output limit curves of polygonal-shape and peak shape analyze and verify the rationality of the two curves and put forward application suggestions.The results show that the two curves can greatly improve the prediction accuracy of hydropower station and power grid dispatching for short-term intraday expected output.The two curves can be applied to the scheduling requirements of low head and run-of-river hydropower stations under different water head conditions which has certain reference significance.
作者
张志娇
陆晓玮
钟华昌
ZHANG Zhijiao;LU Xiaowei;ZHONG Huachang(Guangxi Vocational College of Water Resources and Electric Power Nanning 530023 ,China;Hongshui River Centralized Control Center of Guangxi Guiguan Electric Power Co.Ltd.Nanning 530025 ,China)
出处
《红水河》
2024年第2期22-26,36,共6页
Hongshui River
关键词
出力限制曲线
调度运行
折线形
山峰形
水位
发电流量
河床式水电站
output limit curve
scheduling operation
polygonal-shape
peak shape
water level
power generation flow
hydropower station in river channel
作者简介
第一作者:张志娇(1986),女,河北石家庄人,工程师,硕士,主要从事水利水电工程管理设计与教学工作。E-mail:664797133@qq.com。