摘要
以滇中引水工程楚雄段-昆明段非标准马蹄形断面为研究对象,采用几何分割法对该马蹄形断面的水力要素进行了推理,推导出任意水深所对应水力要素表达式。同时,采用三分试算法计算了该断面正常水深,试算过程采用C#编程来实现。考虑到马蹄形断面正常水深计算的复杂性,采用拟合优化原理推导出正常水深的直接计算公式。计算结果表明:在该公式的适用范围内计算该断面正常水深的最大相对误差为0.496%,同时整个计算区间内89.3%以上计算点相对误差小于0.24%,精度相对较高,可以满足实际工程的需要。
This paper focuses on the analysis of the non-standard horseshoe-shaped section of the Chuxiong-Kunming segment of the Water Diversion Project in Central Yunan.It utilizes a geometric segmentation approach to deduce the hydraulic elements for this unique section,providing expressions for these elements at varying water depths.Additionally,it employs a three-part trial algorithm to calculate the normal water depth for the section,and this trial calculation process was facilitated by using C#programming.Recognizing the complexity of normal water depth calculations for such a section,a direct calculation formula for normal water depth is derived by using a fitting optimization principle.The results of the calculations reveal that within the applicable range of the formula,the maximum relative error in computing the normal water depth of the section is only 0.496%.Furthermore,over 89.3%of the calculated points within the entire calculation interval exhibit a relative error of less than 0.24%.These findings signify a relatively high level of precision in the calculations,demonstrating their suitability for meeting the requirements of actual projects.
作者
牛鹏举
邹进
许开和
胡宇昕
NIU Peng-ju;ZOU Jin;XU Kai-he;HU Yu-xin(School of Electrical Engineering,Kunming University of Science and Technology,Kunming 650500,Yunnan Province,)
出处
《中国农村水利水电》
北大核心
2024年第3期116-120,共5页
China Rural Water and Hydropower
基金
国家自然科学基金项目(41061053)。
关键词
非标准马蹄形断面
正常水深
三分试算法
水力计算
滇中引水工程
non-standard horseshoe-shaped section
normal water depth
three-part test algorithm
hydraulic calculation
Water Diver‐sion Project in Central Yunnan
作者简介
牛鹏举(1998-),男,硕士研究生,研究方向为水文学及水资源。E-mail:2778414647@qq.com。;通讯作者:邹进(1973-),女,副教授,博士,硕士生导师,研究方向为水文学及水资源。E-mail:Jone_zou@163.com。