摘要
文章以110 kV四回路钢管杆为例,对线路导线由垂直排列变为水平排列进行了研究,旨在满足地方政府的规划要求,同时节约土地资源,降低工程费用,避免重复建设,减少对自然环境的破坏,减少对周围环境景观的影响,减少输电线路停电时间等,符合建设“两型三新”电网建设理念,该项目可以应用到工程实际中并能取得较好的经济效益和社会意义。通过对比分析,由垂直排列变为水平排列的方法切实可行,安全可靠,适用于各种实际情况,值得推广使用。
This article takes the 110 kV four circuit steel pipe pole as an example to study the transformation of line conductors from vertical arrangement to horizontal arrangement,aiming to meet the planning requirements of local governments,while saving land resources,reducing engineering costs,avoiding duplicate construction,reducing damage to the natural environment,reducing the impact on the surrounding environmental landscape,and reducing power outage time of transmission lines.It is in line with the construction concept of"two types and three new"power grid construction,This project can be applied to engineering practice and achieve good economic benefits and social significance.Through comparative analysis,the method of changing from vertical arrangement to horizontal arrangement is feasible,safe and reliable,suitable for various practical situations,and worthy of our promotion and use.
作者
张辉
蒋锋
刘正茂
周嘉勋
ZHANG Hui;JIANG Feng;LIU Zhengmao;ZHOU Jiaxun(State Grid Zhejiang Electric Power Company Huzhou Electric Power Design Institute Co.,Ltd,Zhejiang Huzhou 313000,China)
出处
《农村电气化》
2024年第2期20-25,共6页
Rural Electrification
关键词
四回路钢管杆
垂直排列
水平排列
four circuit steel pipe pole
vertically arranged
horizontally arranged