摘要 火力发电厂空冷发电机组夏季运行时,由于天气炎热,空冷岛冷却效率降低,发电机组的背压升高,燃煤经济性降低甚至必须降低负载率以保证设备的正常运行。为此,空冷发电机组正逐步推广尖峰冷却循环系统,来为发电机组提供额外的冷却以降低背压。但尖峰冷却系统多以城市中水作为循环用水,水体的硬度较高且为开式循环,长时间运行必然会导致冷却系统的管壁和凝汽器两端出现严重的结垢和积垢问题。本文分析了尖峰冷却系统结垢的原因以及目前处理和预防水垢的方法,并对各种方法进行比对,探讨他们之间的差异及其各方法的可行性和经济性,对除垢防垢技术的未来发展提供除了自己的思路。 When the thermal power plant air-cooled generator set is running in summer,due to the hot weather,the cooling efficiency of the air-cooled island is reduced,the back pressure of the generator set is increased,the coal-fired economy is reduced,and the load rate must be reduced to ensure the normal operation of the equipment.For this reason,air-cooled generator sets are gradually promoting peak cooling systems to provide additional cooling for generator sets to reduce back pressure.However,the peak cooling system uses urban reclaimed water as circulating water,and the hardness of the water body is relatively high.Long-term operation will inevitably lead to serious scaling and fouling problems on the pipe wall and both ends of the condenser of the cooling system.This paper analyzes the causes of fouling in the peak cooling system and the current methods of treat-ment and prevention of scaling.After comparing the differences between them and the feasibility and economy of each method,the development of an-ti-scaling and de-scaling technology in the future was also discussed.
作者 刘韶军 张宇 潘志伟 褚家范 胡政 张立强 Liu Shaojun;Zhang Yu;Pan Zhiwei;Chu Jiafan;Hu Zheng;Zhang Liqiang(Shanxi Electric Power Co.,Ltd.,CHN Energy Group,Shanxi,030021;Beijing Huazhi Liheng Science and Trade Co.,Ltd.,Beijing,100010)
出处 《当代化工研究》 CAS 2024年第3期108-110,共3页 Modern Chemical Research
关键词 火力发电厂 尖峰冷却系统 结垢 防治 thermal power plant spike cooling system scaling processing method
作者简介 刘韶军(1976-),男,汉族,山西平陆人,本科,中级工程师,研究方向:热能与动力工程。
  • 相关文献

参考文献7

二级参考文献66

共引文献30

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部