摘要
以青藏线西宁至格尔木提质工程德令哈站站房项目BIM正向设计及应用过程为基础,探索BIM技术在正向设计阶段的工作要点和技术难点,以实现工程量、施工图、配筋图、计算文件等与模型的联动,减少数据搬运的工程及人为的错误,提高工作效率。
Based on the BIM forward design and application process in Delingha Station house project of the Xining-Geermu Quality Improvement Project of the Qinghai-Xizang Line,this paper explores the key points and technical difficulties of BIM technology in the forward design stage,so as to realize the linkage of engineering quantity,construction drawings,reinforcement drawings and calculation files with the model,reduce the data transfer engineering and human errors,and improve work efficiency.
作者
王滨
Wang Bin(China Railway First Survey and Design Institute Group Lanzhou Railway Design Institute Co.,Ltd.,Lanzhou 730000,Gansu Province,China)
出处
《科学与信息化》
2023年第24期46-48,共3页
Technology and Information
关键词
BIM技术
建筑信息模型
BIM正向设计
建筑设计
BIM technology
building information modeling
BIM forward design
architectural design