期刊文献+

CPR1000核电机组压力容器水压试验实施过程概述

An Overview of the Implementation Process of the Hydrostatic Test of the Pressure Vessel of the CPR1000 Nuclear Power Unit
在线阅读 下载PDF
导出
摘要 CPR1000核电机组是我国核电版图的重要组成部分,该项技术是在引进法国M310技术后改良、优化,形成的核电技术。CPR1000机组的压力容器需结合法系规范《压水堆核电厂核岛机械部件在役检查规则》(RSE-M)对容器在一定的周期实施水压试验,用以验证容器的密封性和完整性,以保障容器在役阶段的安全可靠运行。安全有序的试验实施有助于压力容器的性能验证,重点介绍压力容器水压试验实施的关键步骤,为CPR1000核电机组压力容器水压试验工作过程管理提供参考。 The CPR1000 nuclear power unit is an important part of China's nuclear power layout.This technique is a nuclear power technique formed by improving and optimizing the introduced French M310 technique.The pressure vessel of the CPR 1000 unit needs to carry out a hydrostatic test on the vessel in a certain period in combi-nation with the French code Code on the In-Service Inspection of Mechanical Components on Nuclear Islands of Pressurized Water Reactor Nuclear Power Plants(RSE-M)to verify the tightness and integrity of the vessel,so as to ensure the safe and reliable operation of the vessel during the in-service period.The implementation of safe and orderly tests helps to verify the performance of pressure vessels.This article will focus on the introduction of the key steps of implementing the hydrostatic test of pressure vessels,so as to provide a reference|for the management of the hydrostatic test process of the pressure vessel of the CPR 1000 nuclear power unit.
作者 赵博文 赵伟华 李茂超 谢剑芳 张鼎超 江奎融 ZHAO Bowen;ZHAO Weihua;LI Maochao;XIE Jianfang;ZHANG Dingchao;JIANG Kuirong(Shenzhen Branch of Suzhou Nuclear Power Research Institute Co.,Ltd.,Shenzhen,Guangdong Province,518000 China)
出处 《科技资讯》 2023年第20期82-85,共4页 Science & Technology Information
关键词 水压试验 压力容器 实施过程 临时特殊装置(TSD) Hydrostatic test Pressure vessel Implementation process Temporary special device(TSD)
作者简介 赵博文(1995-),男,本科,助理工程师,研究方向为核岛容器水压试验。