摘要
                
                    针对预应力厚板转换层存在结构复杂、工程量大、施工难度大等问题,结合具体工程项目,着重分析转换层施工过程中模板支撑架设、钢筋绑扎、大体积混凝土浇筑、施工缝处理、预应力张拉等多个问题,阐述了预应力厚板的标准施工流程。
                
                Aiming at the problems of complex structure,large engineering quantity and difficult construction of prestressed thick slab transfer floor.This paper combines specific engineering projects,mainly analyzes formwork support erection,steel binding,mass concrete pouring,construction joint treatment,prestressed tensioning and other issues in the construction process of transfer floor,and expounds the standard construction process of prestressed thick slab.
    
    
                作者
                    胡成
                    陈哲
                    高凯强
                    陈嘉良
                HU Cheng;CHEN Zhe;GAO Kai-qiang;CHEN Jia-liang(China State Construction Engineering(Hong Kong)Limited,Hong Kong 999077,China;China Construction Engineering(Macao)Company Limited,Macao 999078,China)
     
    
    
                出处
                
                    《工程建设与设计》
                        
                        
                    
                        2023年第13期201-203,共3页
                    
                
                    Construction & Design for Engineering
     
    
                关键词
                    预应力厚板转换层
                    施工技术
                    大体积混凝土
                    施工缝
                    后张法
                
                        prestressed thick transfer slab
                        construction technology
                        mass concrete
                        construction joint
                        post-tensioning method
                
     
    
    
                作者简介
胡成(1988-),男,湖北武汉人,工程师,从事土木工程、工程管理研究。