摘要
葛泉矿东井分为东一采区和东二采区,固定带式输送机运输长度约3000 m,根据现状,安装了KTC150带式输送机集中控制系统,简述了KTC150带式输送机集控系统组成和结构,重点从减少带式输送机空转节约电能、节约人工费用、减少皮带备件损耗等方面进行了经济性分析,实现了地面对井下运输带式输送机的远程集中控制。
The east well of Gequan Mine is divided into east mining area 1 and east mining area 2.The fixed belt transportation length is about 3000 meters.According to the current situation,the KTC150 belt centralized control system is installed.The composition and structure of the KTC150 belt centralized control system are briefly described.The economic analysis is focused on reducing the idling of belt conveyor,saving electricity,saving labor costs,reducing the loss of belt spare parts and other aspects,and the remote centralized control of underground transportation belt conveyor from ground is realized.
作者
关晓彤
Guan Xiaotong(Jizhong Energy Co.,Ltd.,Hebei Xingtai 054000)
出处
《山东煤炭科技》
2023年第3期147-149,共3页
Shandong Coal Science and Technology
关键词
煤矿
带式输送机
集中控制
技术经济分析
coal mine
belt conveyor
centralized control
technical and economic analysis
作者简介
关晓彤(1989-),女,河北邯郸人,2013年毕业于中国矿大(徐州)工商管理专业,本科,经济师,现从事煤矿设备管理工作。