仰光外海引航站项目施工关键技术研究

Study on key technology for construction ofYangon Offshore Pilot Station
在线阅读 下载PDF
导出
摘要 缅甸作为东南亚最不发达的地区之一,社会资源匮乏,施工依托条件差,建筑市场不完善。仰光外海引航站项目位于印度洋的安达曼海地区,常年受季风影响较大。引航站为仰光港进口船舶入港提供引航服务,地处仰光河外20 n mile处,周边无掩护,施工区域受风浪和周边通航船舶影响较大。为解决境外项目外海施工难题,需对施工现场自然条件进行分析,选择合适的施工窗口期,通过试验和检测数据对设计进行合理优化,结合现有施工条件对传统施工工艺进行优化,满足外海施工要求,同时人员、船舶设备、材料等施工组织是项目成功的关键,为其它类似项目施工积累宝贵经验。 As one of the least developed regions in Southeast Asia,Myanmar suffers from lack of social resources,poor construction conditions and imperfect construction market.Yangon Offshore Pilot Station is located in the Andaman Sea region of the Indian Ocean,which is affected by the monsoon all year round.The pilot station provides pilotage services for ships entering the Port of Yangon,which is located 20 nautical miles off the estuary of the Yangon River with no shelter around,and the construction area is greatly affected by winds,waves and navigating vessels in the area.To solve problems in construction of the overseas project off the coast,it is necessary to analyze the natural conditions of the construction site,select appropriate construction window peroid,rationally optimize the design by test and inspection data,and optimize the traditional construction technology according to the existing construction conditions to meet the requirements of offshore construction.At the same time,staff and personnel,marine equipment,materials and other construction organizations are the key to the success of the project.Valuable experience is accumulated for construction of other similar projects.
作者 陶立双 邓应桥 TAO Li-shuang;DENG Ying-qiao(CCCC Third Harbor Engineering Co.,Ltd.,Shanghai 200030,China)
出处 《中国港湾建设》 2023年第3期93-98,共6页 China Harbour Engineering
关键词 境外项目 外海作业 设计优化 施工组织 overseas project offshore operation design optimization construction organization
作者简介 陶立双(1970-),男,安徽萧县人,工程硕士,高级工程师,主要从事港口航道与土木工程施工技术管理工作。E-mail:taolishuang@cccc。
  • 相关文献

参考文献8

二级参考文献3

  • 1JTSl67-1-2010,高桩码头设计与施工规范[S].第13章节“构件预制、吊运及安装”(48-51)及第14章节“现场浇筑混凝土”(52-53).
  • 2JTS202-2011,水运工程混凝土施工规范[S].第8章节“混凝土工程”8.3节“浇筑”部分(39-41).
  • 3JTJ295-2000,开敞式码头设计与施工技术规程[s].第6.2章节“施工组织设计”(22-26),第8章节“构件预制、出运和存放”(29-30).

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部