期刊文献+

中央水库移民扶持基金绩效管理体系构建过程与优化调整研究 被引量:3

A study on establishing and optimizing the performance management system of support fund for resettlement of large and medium-sized reservoir
在线阅读 下载PDF
导出
摘要 2015年以来,水利部和财政部构建了以绩效目标为导向、绩效运行监控、绩效评价、评价结果与资金分配挂钩等相结合的中央水库移民扶持基金全过程绩效管理体系。绩效评价结果与年度预算资金分配直接挂钩,充分发挥了奖优罚劣的激励约束作用。“十四五”时期,移民工作进入新发展阶段,中央水库移民扶持基金绩效管理有关内容和部分评价指标有必要适时进行优化调整。文章从开展绩效目标申报管理、绩效目标执行监控、绩效评价指标体系修订、重大项目绩效评价等方面,提出了优化完善中央水库移民扶持基金绩效管理体系的有关政策建议,以期为改进绩效管理工作提供借鉴参考。 Since the year of 2015, the Ministry of Water Resources and the Ministry of Finance have conducted subject research, nationwide trial, and performance evaluation for six consecutive years, based on which the performance management system of support fund for the central reservoir resettlement has been established. It’s a whole-process management system with performance objective oriented, multi-dimensional performance operation monitored, performance evaluation fully covered, and evaluation results linked with fund allocation, this linkage has been playing an important role of incentive and restraint. During the 14thFive-Year Plan period, the reservoir resettlement work has entered a new phase, and the relevant content and some evaluation indicators of the performance management of the central reservoir resettlement support fund need to be optimized and adjusted in a timely manner. Centering on declarationand scientific management of performance objective, regular monitoring of performance implementation, timely updating performance evaluation index system, and exploration of performance evaluation for large-scale projects, this article provides suggestions to optimizethe performance management system of the central reservoir resettlement support fund, which can be used as reference to improve the performance management in the future.
作者 李苓 樊连生 LI Ling;FAN Liansheng(ChangJiang Project Supervision&Consultancy Co.Ltd.of Changjiang Water Resources Commission,Wuhan 430010,Hubei,China)
出处 《水利发展研究》 2023年第2期70-74,共5页 Water Resources Development Research
关键词 水库移民 后期扶持 绩效管理 体系构建 优化调整 reservoir resettlement late-stage support performance management system establishment optimization and adjustment
作者简介 李苓(1982-),女,硕士,高级工程师,主要从事水库移民政策研究、绩效管理、咨询评估等工作。
  • 相关文献

参考文献3

二级参考文献31

共引文献28

同被引文献21

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部