顶板极限跨距在神州煤业充填开采的运用 被引量:1

Application of Roof Limit Span in Shenzhou Coal Industry Filling Mining
在线阅读 下载PDF
导出
摘要 神州煤业4604(1)工作面为充填试采面,若充填步距过小,影响回采推进速度,若充填步距过大,直接顶控制不到位,进而破坏地表建筑物。通过运用顶板极限跨距理论计算确定充填步距。现场充填试验表明:充填后地表最大下沉值98 mm,最大拉伸变形0.22 mm/m,最大压缩变形0.23 mm/m,最大倾斜变形0.44mm/m,均在I损坏变形范围以内,达到了预期效果。 The 4604(1)working face of Shenzhou Coal Industry is the filling trial mining face,if the filling step distance is too small,it will affect the mining advance speed;if the filling step distance is too large,the direct roof control is not in place,thus destroying the surface buildings.The filling step is determined by using the roof limit span theory.The field filling test shows that the surface maximum subsidence value is 98 mm,the maximum tensile deformation is 0.22 mm/m,the maximum compression deformation is 0.23 mm/m and the maximum inclination deformation is 0.44 mm/m.All of them are within the range of I damage and deformation,and the expected results are achieved.
作者 刘水华 Liu Shuihua(Taiyuan Coal Gasification(Group)Co.,Ltd.,Shanxi Taiyuan 030000)
出处 《山东煤炭科技》 2023年第2期45-47,共3页 Shandong Coal Science and Technology
关键词 顶板 充填 步距 极限跨距 roof filling step distance limit span
作者简介 刘水华(1986-),男,山西长治人,2014年毕业于中国石油大学(华东)采矿工程专业,本科,工程师,研究方向:采掘技术管理。
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部