摘要
根据分段浇筑理念,房建工程可将浇筑区域平均划分为多个施工区域,确定合理的浇筑速度和浇筑顺序,按施工工艺要求执行浇筑操作。工程对浇筑后的大面积混凝土进行覆盖型保湿保温养护,得到高质量的混凝土浇筑效果。从具体施工可以看出,应用文中介绍的施工技术后,混凝土浇筑区段的最大向上变形挠度为1.98mm,最小向上变形挠度为0.56mm。
At present, according to the concept of sectional pouring, the housing construction project can divide the pouring area into several construction areas on average, determine the reasonable pouring speed and sequence, and carry out the pouring operation according to the requirements of the construction process. The project carries out covering type moisturizing and thermal insulation curing for large area of concrete after pouring to obtain high-quality concrete pouring effect. From the concrete construction, it can be seen that after the application of the construction technology introduced in this paper, the maximum upward deformation deflection of the concrete pouring section is 1.98mm,and the minimum upward deformation deflection is 0.56mm.
作者
陈峰
Chen Feng(Yancheng Dafeng People's Hospital Infrastructure Department,Yancheng,Jiangsu 224100)
出处
《江西建材》
2022年第10期227-228,231,共3页
Jiangxi Building Materials
关键词
材料配合比
混凝土布料机
分段浇筑
Material mix ratio
Concrete fabric distributor
Section pouring
作者简介
陈峰(1965-),男,江苏盐城人,本科,高级工程师,主要研究方向为建筑工程质量及技术。