摘要
结合上海、合肥、徐州等城市轨道交通联调项目经验,针对车站机电设备调试的特点和难点,总结出车站机电设备联调策略,并对城市轨道交通初期运营前安全评估涉及车站机电设备的测试科目进行了梳理。结合工期和初期运营前安全评估经验,制定出“三步走”的车站机电设备联调策略。
Combined with the experiences of urban rail transit joint debugging projects in Shanghai,Hefei,Xuzhou and other cities,targeting the characteristics and difficulties of station electromechanical equipment debugging,the joint debugging strategy of station electromechanical equipment is summarized.The test items of station electromechanical equipment related to urban rail transit primary operation safety assessment are sorted.Combined with the safety assessment experience before construction period and primary operation,a′three-step′station electromechanical joint debugging strategy is formulated.
作者
谭玉良
TAN Yuliang(Shanghai Shentong Rail Transit Research and Consultancy Company,201103,Shanghai,China)
出处
《城市轨道交通研究》
北大核心
2022年第10期206-209,共4页
Urban Mass Transit
关键词
城市轨道交通
车站
机电设备
联调策略
urban rail transit
station
electromechanical equipment
joint debugging strategy
作者简介
谭玉良,工程师。