摘要
在中心城区改造项目的深基坑施工过程中,时常会遇到重要管线穿越基坑且无法迁移,围护结构与管线碰撞、深层土位移导致管线变形等一系列管线保护的难题,为此,以嘉兴中山路改造市政工程为例,详细介绍了重要电力高压管线及国防光缆横穿通道基坑的保护方法。所总结的经验可为今后同类工程提供参考。
During the construction of deep foundation pit in the reconstruction project of central urban area,a series of pipeline protection problems are often encountered,such as the important pipelines passing through the foundation pit and unable to be relocated,the collision between retaining structure and pipeline,and the deformation of pipeline caused by deep soil displacement.Therefore,taking the municipal reconstruction project of Zhongshan Road in Jiaxing as an example,the protection methods of important power high-voltage pipelines and national defense optical cables crossing the channel foundation pit are introduced in detail.The experience summarized can provide reference for similar projects in the future.
作者
徐永明
XU Yongming(Shanghai Construction No.2(Group)Co.,Ltd.,Shanghai 200080,China;Shanghai Engineering Research Center of Top-Down Method in Construction Engineering,Shanghai 200090,China)
出处
《建筑施工》
2022年第6期1238-1240,共3页
Building Construction
关键词
老城区改造
管线保护
MJS工法
型钢悬吊
reconstruction of old urban areas
pipeline protection
MJS construction method
section steel suspension
作者简介
徐永明(1968—),男,本科,工程师。通信地址:上海市杨浦河间路2号(200090)。电子邮箱:3284329139@qq.com。