期刊文献+

BIM技术在建筑运维管理中的应用研究 被引量:4

Research on the Application of BIM Technology in Building Operation and Maintenance Management
在线阅读 下载PDF
导出
摘要 建筑运维阶段是建筑全生命周期中的关键阶段,而传统的运维管理模式数字化程度低,导致信息传递分散、工作效率低,很难满足运维人员的管理需求。本研究基于BIM技术的数据集成优势,将BIM技术引入建筑运维管理过程中,构建了基于BIM的建筑运维管理模式。该模式能够解决传统运维管理信息资料混乱、丢失等问题,同时使数据查询变得方便及时,大大降低了运维管理难度,提升了工作效率。 The building operation and maintenance stage is a key stage in the whole life cycle of the building,and the traditional operation and maintenance management mode has a low degree of digitalization,which leads to scattered information transfer and low work efficiency,and it is difficult to meet the management needs of operation and maintenance personnel.Based on the data integration advantages of BIM technology,this study introduces BIM technology into the building operation and maintenance management process and constructs a BIM-based building operation and maintenance management mode.The analysis shows that this mode can solve the problems of traditional operation and maintenance management information data confusion and loss,and make data query convenient and timely,greatly reducing the difficulty of operation and maintenance management and improving work efficiency.
作者 訾妍 谢强 钟炜 ZI Yan;XIE Qiang;ZHONG Wei(School of Management,Tianjin University of Technology;Tianjin Eco-city State-owned Assets Management Co.,Ltd.)
出处 《智能建筑与智慧城市》 2022年第6期12-14,共3页 Intelligent Building & Smart City
基金 天津市智能制造专项资金项目:生态城公共项目资产数字化管理平台,项目编号:20201195。
关键词 建筑项目 BIM技术 运维管理 信息集成 construction projects BIM technology operation and maintenance management information integration
  • 相关文献

参考文献5

二级参考文献42

  • 1蔡可心.4所美国高校BIM标准简介[J].土木建筑工程信息技术,2013,5(4):41-44. 被引量:11
  • 2曾旭东,赵昂.基于BIM技术的建筑节能设计应用研究[J].重庆建筑大学学报,2006,28(2):33-35. 被引量:79
  • 3蒋东兴,郭大勇,罗念龙,刘启新.清华大学新一代数字校园建设规划与实践[J].厦门大学学报(自然科学版),2007,46(A02):173-178. 被引量:79
  • 4McGraw-Hill Construction. The Business Value of BIM- Getting Building Information Modeling to the Bottom Line [ R ]. New York : McGraw-Hill Construction,2009:6.
  • 5Charles Eastman, David Fisher, Gilles Lafue, et al. An outline of the building descripiton system [ R ]. Pitts- burgh : Carnegie-Mellon University, 1974:4.
  • 6GA Van Nederveen,FP Tolman. Modeling multiple views on buildings[J]. Automation in Construction, 1992, 1 (3) :215 -224.
  • 7Laiserin Jerry. Comparing pommes and naranjas [ EB/ OL ]. http: //www. laiserin, com/features/issuel5/fea- ture01, php,2002 - 12 - 16.
  • 8廖晨雅,谭大璐,李昀轩.基于BIM的建筑运营阶段精益管理[A]//2012中国工程管理论坛论文集[C].合肥:中国工程院工程管理学部,2012:92-94.
  • 9C Koch. Operations management on the construction site-developing a human resource and knowledge orien- ted alternative to lean construction [ C ] //20th Annual ARCOM Conference. Edinburgh Campus: Heriot Watt University, 2004 (2) : 1017 - 1027.
  • 10Vladimir Popova, Virgaudas Juoceviciusa, Darius Migil- inskasa,et al. The use of a virtual building design and construction model for developing an effective project concept in 5D environment[ J]. Automation in Construc- tion, 2010,19(3) :357 -367.

共引文献94

同被引文献13

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部