基于合理施工状态的斜拉桥调索方法研究 被引量:2

Research on Cable Force Adjustment Method of Cable-stayed Bridge Based on Reasonable Construction State
在线阅读 下载PDF
导出
摘要 昌吉赣客专赣江特大桥是国内首座高速铁路混合梁斜拉桥,其主梁结构首次采用闭口式钢箱和混凝土桥面板的组合形式,桥面板内设置预应力钢束。施工过程中的桥面板预应力张拉和混凝土收缩徐变效应使主梁斜拉索索力在每个施工阶段均发生变化,因此索力调整难度骤增。为降低索力调整难度,文章采用有限元法建模计算分析,通过保证桥面施工阶段的合理线形确定斜拉索的成桥索力值。计算结果与传统正装—倒拆法得出的成桥状态数据相吻合,验证了文章方法的合理性,同时为该类型斜拉桥的设计与复核计算提供了新方法。 Ganjiang Bridge is the first high-speed railway hybrid girder cable-stayed bridge in China.Its main girder structure adopts the combination form of closed steel box and concrete bridge deck for the first time,and the prestressed steel tendons are set in the bridge deck.Due to the prestressed tension of the bridge deck and the shrinkage and creep effects of the concrete during the construction process,the cable force of the stay cable of the main girder at each construction stage changes,resulting in a sudden increase in the difficulty of adjusting the cable force.In order to reduce the difficulty of adjusting the cable force,the finite element method is used for modeling and calculation analysis,and the cable force value of the stay cable is determined by ensuring a reasonable line shape during the bridge deck construction stage.The research results are in good agreement with the bridge in completion state obtained by the traditional forward-backward iterative method.It provides a new method for the design and calculation of cable force of cable-stayed bridges.
作者 王家悦 WANG Jiayue(Changsha Planning&Design Institute Co.,Ltd.,Changsha Hunan 410005,China)
出处 《长沙大学学报》 2022年第2期37-43,共7页 Journal of Changsha University
基金 中南大学中央高校基本科研业务费专项资金资助,编号:2017ZZTS155 中国铁路总公司科技研究开发计划“大跨度桥梁铺设无砟轨道技术深化研究”,编号:2015G001-G。
关键词 混合梁斜拉桥 合理施工状态 成桥索力值 设计与计算 hybrid girder cable-stayed bridge reasonable construction state cable force value of completed bridge design and calculation
作者简介 王家悦,长沙市规划设计院有限责任公司工程师。