摘要
由于拱桥的修建通常具有较高的技术难度,所需要的结构相对复杂,并且在修建的过程中,容易受实际施工中存在的随机性影响,产生施工时期的误差问题,影响钢管混凝土拱桥的修建效果。文章通过对钢管混凝土拱桥施工技术进行研究,针对实际施工过程中遇到的问题提出建议和措施,促进钢管混凝土公桥建设技术水平的提高。
Because the construction of arch bridge usually has a high technical difficulty,the structure is relatively complex,and during the process of construction,easily to be affected by the randomness of the actual construction,the construction period error problem,affecting the construction effect of concretefilled steel tube arch bridge.Based on the research on the construction technology of concrete-filled steel tube arch bridge,the paper puts forward suggestions and measures for the problems encountered in the actual construction process,and promotes the improvement of the construction technology level of concrete-filled steel tube arch bridge.
作者
张柱明
ZHANG Zhuming(The Fourth Engineering Co.,Ltd.of China Zhongtie Major Bridge Engineering Group,Harbin 150000,China)
关键词
钢管混凝土
拱桥施工
问题
concretefilled steel tube
arch bridge construction
problem
作者简介
张柱明(1976-),男,山东省临邑人,中铁建大桥局集团第四工程有限公司工程师,研究方向:道路和桥梁施工。