摘要
玉龙喀什水利枢纽工程为和田河支流玉龙喀什河上的控制性工程,具有生态、灌溉、防洪和发电等综合利用功能。文章从水库综合利用任务要求入手,对其调度运行方式进行分析研究,在满足任务的前提下,使其综合利用效益最大化。
Yulongkashi Water Conservancy Project is a control project on Yulongkashi River,a tributary of Hetian River.It has comprehensive utilization functions such as ecology,irrigation,flood control,power generation,etc.The paper starts with the task requirement of reservoir comprehensive utilization,and studies its dispatching operation mode,thereby maximizing its comprehensive utilization benefit under the premise of meeting the task.
作者
吴萌
WU Meng(Xinjiang Water Resources and Hydropower Survey, Design and Research Institute, Urumqi 830000, China)
出处
《中国水能及电气化》
2021年第12期3-7,共5页
China Water Power & Electrification
关键词
玉龙喀什水利枢纽
调度运行
方式
Yulongkashi Water Conservancy Project
dispatching operation
mode