摘要
本文介绍了巴基斯坦卡拉奇“华龙一号”海外首堆在对热态性能试验中涉及的危险源的辨识、危险性的评价、危险源的控制、危险源的应急等,充分分析了试验过程中危险源的产生的原因及特性。采取合理措施,把试验过程中危险降低到可接受的程度,努力把事故发生的概率降低。卡拉奇核电热态性能试验的安全管理,充分吸取了国内类似核电经验,并结合现场实际特点,为卡拉奇核电另一机组及在巴基斯坦国内其他后续核电建设项目中安全管理提供良好实践经验。
The hazard source identification,hazard evaluation,hazard control and hazard emergency in the thermal performance test of the first overseas HPR1000-Karachi NPP are analyzed in this paper.The causes and characteristics of the hazard during the test are fully analyzed.Reasonable measures are taken to reduce the hazard to an acceptable level and reduce the probability of accident.The safety management of the thermal performance test o£Karachi NPP fully absorbs the experience of similar nuclear power plants in China,and provides good practical experience for the safety management of another unit of Karachi NPP and other nuclear power construction projects in Pakistan.
作者
张明磊
卫福奇
王勇
李勍
朱伟
王健
尹逊华
姜二龙
ZHANG Ming-lei;WEI Fu-qi;WANG Yong;LI Qing;ZHU Wei;WANG Jian;YIN Xun-hua;JIANG Er-long(China Zhongyuan Engineering Corp.,Beijing 100044,China)
出处
《中国核电》
2021年第5期753-757,共5页
China Nuclear Power
关键词
卡拉奇核电
危险源辨识
热态性能试验
安全管理
Karachi NPP
hazard source identification
hot functional test
safety management
作者简介
张明磊(1983-),男,安徽淮南人,工程师,硕士,主要从事核电维护保养、调试管理、工业安全、消防安全管理工作,E-mail:zhangminglei@czec.com.cn.