期刊文献+

基于全寿命周期的312国道拓宽改造新老路基相互作用变形规律分析 被引量:2

Analysis of the Interaction and Deformation of the New and Old Subgrade without Step Assembly Based on Total Life Cycle
在线阅读 下载PDF
导出
摘要 依托312国道江苏段改扩建工程,通过比奥(Biot)固结理论有限元方法,分析了整个全寿命周期(即老路从开工到正常运营,再到拓宽路堤施工,至15年的运营末)新老路基无台阶拼接工况下,水平位移和竖直变形的互相作用规律。可为类似高等级公路改扩建工程的施工质量控制提供理论借鉴参考。 Base on the conversion and extension project of national highway G312,from the old time of commencement date,to the end of the construction and after normal operation to old road shoulder excavation,then widening embankment construction,and then to the end of construction,finally through the operations until the widening design life,the whole process was analyzed by Biot consolidation theory of plane strain finite element method of new and old roadbed mutual deformation mechanism and deformation law.The results presented reference to other highway extension construction.
作者 朱晓宁 王惠勇 ZHU Xiaoning;WANG Huiyong
出处 《上海公路》 2021年第3期27-31,M0004,共6页 Shanghai Highways
关键词 全寿命周期 新老路基无台阶拼接 沉降变形 水平位移 差异沉降指标 BIOT life cycle no step splicing of new and old subgrade settlement deformation horizontal displacement differential settlement index BIOT
  • 相关文献

参考文献2

二级参考文献11

共引文献46

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部