某金属矿区桥梁桩基础施工技术研究 被引量:1

A case study of the construction process of pile foundations for a bridge in a metallic mine area
在线阅读 下载PDF
导出
摘要 某金属矿区施工的桥梁基础受到采空区、溶洞叠加影响,导致桩基础施工困难且成桩质量差。为了确保桩基础施工质量,提出采用压注混凝土方式对采空区、溶洞等进行预处理;在桩基础孔施工中采用钢护筒跟进方式确保桩基础钻孔施工质量。现场应用后,在矿区施工的桩基础后期检测质量结果均为Ⅰ类桩,取得显著应用成果。研究成果为其他类似情况下的桩基础施工提供了经验借鉴。 The mined-out areas of a metallic mine,complemented by karst caves,made the construction of the pile foundations of a bridge above very difficult and resulted in poor piles. To ensure file construction quality,it was proposed to inject concrete into the mined-out areas and the karst caves in question,and to use steel sleeve pipes to ensure the quality of foundation bore holes. After these measures were taken,foundation quality tests showed that all the piles were of Class I,hence very successful. This attempt thus brings useful experience to operations under similar circumstance.
作者 刘双辰 LIU Shuangchen
出处 《中国矿山工程》 2021年第4期77-79,共3页 China Mine Engineering
关键词 金属矿区 采空区 溶洞 桩基础 压注混凝土 钢护筒跟进 metallic mine area mined-out area karst cave pile foundation concrete injection steel sleeve protection
作者简介 刘双辰(1980-),男,汉,河北保定人,本科学历,高级工程师,从事岩土工程方面研究。
  • 相关文献

参考文献8

二级参考文献24

共引文献14

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部