某长输管道EPC项目设计变更问题处理

Treatment of design modification issues in a long-distance pipeline EPC project
在线阅读 下载PDF
导出
摘要 以设计单位为主体的EPC总承包模式具有显著的技术和资源优势,但在国内发展尚不成熟,需结合国情在工程建设过程中不断总结经验。以国内某天然气长输管道EPC项目为例,阐述了设计工程师在EPC项目部的职责及沟通方式,指出了设计变更、工程量签证以及工程索赔等方面的要求,通过现场实际案例分析了相关问题的处理方式,包括业主在施工过程中更换设备,项目部通过信函形式追溯;施工分包商恶意签证,项目部要求通过信函形式留痕。这些案例可为今后EPC项目现场问题的处理提供借鉴。 The EPC general contracting mode with the design unit as the main body has significant technical and resource advantages,but its development is not mature in China,so it is necessary to constantly summarize the experience in the process of project construction in combination with the national conditions.Taking an EPC project of long-distance natural gas pipeline as an example,This paper expounds the responsibilities and communication methods of the design engineer in the EPC project department,points out the requirements of design change,engineering quantity verification and project claim,and analyzes the treatment methods of relevant problems through the actual site cases,which include equipment replacement by the owner during construction,tracing by the project department via letters;malicious verifications provided by the construction subcontractor,and requirement to leave a mark via letters by the project department.These cases can provide reference for the treatment of on-site issues in the future EPC projects.
作者 隋冰 SUI Bing(Sinopec Petroleum Engineering Company,Dongying 257000,China)
出处 《石油工程建设》 2021年第4期84-87,共4页 Petroleum Engineering Construction
关键词 国内EPC 设计变更 工程量签证 domestic EPC design modification engineering quantity verification
作者简介 隋冰(1989-),男,山东东营人,工程师,2015年毕业于中国石油大学(华东)油气储运工程专业,硕士,现从事油气管道、站场和油库的设计工作。Email:969008283@qq.com。
  • 相关文献

参考文献7

二级参考文献38

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部