钢-混叠合梁斜拉桥线形及应力误差分析与控制方法 被引量:2

Analysis and Control Method of Alignment and Stress Error of Steel-concrete Composite Beam Cable-stayed Bridge
在线阅读 下载PDF
导出
摘要 为使某钢-混叠合梁斜拉桥在成桥后其几何线形和应力与设计理想状态一致,分别对钢-混叠合梁斜拉桥计算、施工、测量中可能产生的误差进行分析。利用有限元软件建立全桥仿真模型,对工程实例进行结构参数敏感性分析,分析得出钢-混叠合梁斜拉桥成桥线形和应力的敏感参数。根据分析结果,提出相应的计算误差、施工误差及测量误差的控制方法。 In order to realize that the geometric shape and stress of a steel-concrete composite beam cable-stayed bridge are consistent with the design ideal state after completion of the bridge,the possible errors in the calculation,construction and measurement of the steel-concrete composite beam cable-stayed bridge are analyzed respectively.The full bridge simulation model is established by using finite element software,and the sensitivity analysis of structural parameters is carried out for an engineering example.The sensitive parameters of the finished alignment and stress of the cable-stayed bridge are obtained.According to the analysis results,the corresponding control methods of errors in calculation,construction and measurement are put forward.
作者 凌华明 马牛静 王荣辉 黄继荣 LING Huaming;MA Niujing;WANG Ronghui;HUANG Jirong(Traffic Project Management Center of Guangzhou Central District, Guangzhou 510030, China;School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510630, China)
出处 《交通科技》 2021年第2期6-10,共5页 Transportation Science & Technology
基金 国家自然科学基金项目(51678247,51878295) 广州市珠江科技新星项目(201906010009) 华南理工大学中央高校基本科研业务费资助项目(2019MS118)资助。
关键词 钢-混叠合梁 几何线形 敏感性分析 误差控制 steel concrete composite beam geometric alignment sensitivity analysis error control
  • 相关文献

参考文献6

二级参考文献54

  • 1高宗余,张强,王应良.组合结构主梁斜拉桥设计进展[J].铁道勘察,2007,33(z1):50-53. 被引量:21
  • 2张建民,郑皆连,肖汝诚.钢管混凝土拱桥吊装过程的最优化计算分析[J].中国公路学报,2005,18(2):40-44. 被引量:34
  • 3吴运宏,黄晓航.重庆李渡长江大桥斜拉桥施工监控计算[J].桥梁建设,2006,36(A02):180-182. 被引量:15
  • 4Virlogeux M. Recent evolution of cable-stayed bridges [ J ]. Engineering Structures, 1999, 21 : 737-755.
  • 5Fujisawa N, Tomo H. Computer-aided cable adjustment of stayed bridges [ C ]//IABSE. 1985 : 181-190.
  • 6Breen J E. Controlling twist in precast segment concrete bridge[J]. PCI Journal, 1985, 4.
  • 7Furukawa K, Inoue K, Nakayama H, et al. Studies of the management of cable-stayed bridges under construction using multiobjective programming method [ C ]//Proceedings of Japanese Society of Civil Engineering. Japan : 1986 : 1-6.
  • 8Sakai F, et al. Construction control system for cable-stayed bridges[C]//Proe. IABSE. 1988, 92(85) : 147-152.
  • 9Sakai F, et al. Application of construction control system to erection of stiffening truss girder of Rainbow Bridge [ C ]// Proc. Inter. Conf. Bridge into 21 Century. Hong Kong: 1994 : 459-466.
  • 10Seki F, Tanaka S. Construction control system for cablestayed bridge [ C ]// Proceeding of IABSE. 1988, 92 (85) : 181-190.

共引文献256

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部