摘要
在经济飞速发展的背景下,我国对铁路电气化建设提出了更高的要求。电气化铁路接触网工程的改造,是促进我国铁路事业发展、满足社会需求、推动经济发展的重要手段之一。文章结合改建铁路阳安线增建第二线YAZH-1标站后工程的实践施工经验,对电气化铁路接触网改造的施工特点、施工常见问题进行了总结和分析,并提出了针对性策略,为类似工程提供借鉴。
In the context of rapid economic development,China has put forward higher requirements for railway electrification construction.The transformation of electrified railway catenary project is one of the important means to promote the development of chinese railway industry,meet social needs and promote economic development.Combining with the practical construction experience of rebuilding the second line of YAZH-1 station in Yang'an Railway,this paper summarizes and analyzes the construction characteristics and common problems of the electrified railway contact network transformation,and puts forward some targeted countermeasures,provides reference for similar projects.
作者
严鑫
YAN Xin(China Railway 20 Group Electrification Engineering Co.,Ltd.,Xi'an 710119,China)
关键词
铁路
电气化
接触网
改造工程
railway
electrification
catenary
reconstruction project
作者简介
严鑫(1984-),男,陕西咸阳人,中铁二十局集团电气化工程有限公司工程师,研究方向:电气化铁路接触网专业施工生产管理。