摘要
以宁句城际轨道交通工程东句区间盾构隧道为背景,通过BIM与倾斜航测技术的结合应有来分析盾构接收过程中的风险源,进而采取合理的防治措施,为盾构施工风险预估提供技术支持,并合理规划施工用地,实现了施工过程中的全方位管控。
Based on the construction of the shield tunnel in Dongju section of Ningju intercity rail transit project(Nanjing Metro Line S6),risk source in the process of shield receiving is analyzed through the combination of BIM and oblique aerial survey technology.Reasonable prevention measures are taken to provide the risk estimation of shield construction with technological support.The construction site is scientifically planned to ensure the management and control of the whole construction process.