摘要
尤溪洋汤线公路工程项目位于福建省尤溪县辖内,全线总长25.171km,按照二级公路标准建设,地面自然坡度大多均在20°~70°,地形地貌条件对项目建设困难较大。文章以尤溪洋汤线公路工程为例,结合类似工程建设经验,从施工全过程角度梳理了尤溪洋汤线工程高填方实施过程中的控制要点,指出了施工中出现的问题并提出了解决方案。
The Youxi Yangtang highway project is located in Youxi County, Fujian Province, with a total length of 25.171 km. In accordance with the standard construction of secondary roads, most of the natural slope of the ground is 20° ~ 70°. The topographic and geomorphic conditions are very difficult for the project construction. Taking the Youxi Yangtang highway project as an example, this paper sorts out the key points of control during the implementation of the high fill of Youxi Yangtang Line project from the perspective of the whole construction process combined with the construction experience of similar projects. It points out the problems in the construction and puts forward the solutions.
作者
王宝伟
Wang Baowei(Hecheng Engineering Consulting Group Co.,Ltd.,Xiamen,Fujian 361000)
出处
《工程技术研究》
2020年第24期164-165,共2页
Engineering and Technological Research
关键词
高填方
压实
排水
监测
high fill
compaction
drainage
monitoring