摘要
为解决超大水位差的客运码头上下船工艺设计问题,结合实际工程项目,提出了斜坡道缆车、垂直电梯、自动人行道等工艺方式,分析了每种方式的关键技术和特点,可为类似工程设计提供参考。
In order to solve the design problem of the boarding technology of the passenger terminal with large water level difference,based on the actual engineering project,the ramp cable car,vertical elevator,moving walkway and other technology methods are proposed,and the key technology and characteristics of each method are analyzed,which can provide reference for similar engineering design.
作者
李华帅
王晓琨
Li Huashuai;Wang Xiaokun(CCCC Second Harbor Consultants Co.,Ltd.)
出处
《港口装卸》
2021年第1期59-62,共4页
Port Operation
关键词
超大水位差
客运码头
上下船工艺
large water level difference
passenger terminal
boarding technology
作者简介
李华帅,430000,武汉市武昌区民主路555号。