摘要 核反应堆压力容器是核电站唯一不可更换的核心设备,承受高温、高压、强辐射,设计标准规格高、制造工艺难度大、质量控制要求严,而关键焊接技术直接影响设备的质量及制造进度,不仅与核电站建设、运营的经济效益息息相关,更是核安全的基石,甚至影响国家安全。通过对“华龙一号”RPV关键焊接技术的特点及典型质量问题的分析,对焊接工艺、技术的研究,优化以及工程实践,显著提升了“华龙一号”RPV的焊接质量,同时大幅缩短制造工期、节约工程成本,对后续“华龙”RPV的制造提供了宝贵的技术积累和工程经验。 The nuclear reactor pressure vessel(RPV)is the only non-replaceable core equipment in the nuclear power plant,which can withstand high temperature,high pressure and strong radiation.It has high design standards and specifications,difficult manufacturing process and strict quality control requirements.And the key welding technologies directly affect the quality and manufacturing schedule of the equipment,which is not only closely related to the economic benefits of nuclear power plant construction and operation,but also is the cornerstone of nuclear safety and even influences national security.In this article,by analyzing the characteristics of key welding technology and the typical quality problems of HPR1000 RPV,and by the research andoptimization and engineering practice of welding technology,the welding quality of HPR1000 RPV is significantly improved,meanwhile the time limit for a project is greatly shorten and the engineering cost is saved.This provides a valuable technical accumulation and engineering experience for subsequent manufacturing of HPR1000 RPV.
作者 邹国伟 王伟波 ZOU Guowei;Wang Weibo(China Nuclear Power Engineering Co.,Ltd.,Shenzhen 518124,China)
出处 《电焊机》 2020年第12期65-73,I0006,共10页 Electric Welding Machine
关键词 华龙一号 反应堆压力容器 焊接技术 工艺优化 质量 HPR1000 reactor pressure vessel weld-ing technology process optimization quality
作者简介 邹国伟(1982—),男,本科,工程师,主要从事核电及特种设备焊接的研究。E-mail:zly20061026@163.com。
  • 相关文献

参考文献5

二级参考文献23

共引文献33

同被引文献33

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部