东山供水9#隧洞贯通后洞内设备拆卸施工

A Brief Discussion on the Disassembly Scheme of Equipment in Dongshan Water Supply No.9 Tunnel after Completing its Works
在线阅读 下载PDF
导出
摘要 目前,国内长大隧洞采用TBM掘进施工的越来越多,这类隧洞施工需在洞内布置专业且复杂的配套设备,用于支持TBM的掘进。因此,在隧洞贯通后洞内设备拆卸也需要有计划、有序地进行,以减少拆卸设备的损伤,保证设备最大程度的重复利用率。文中以东山供水9#隧洞贯通后为例,重点阐述了洞内设备的拆卸。 At present,more and more large tunnels in China adopt TBM tunneling,which requires professional and complex supporting equipment to be arranged in the tunnel to support TBM tunneling.Therefore,in order to reduce the damage of the disassembly equipment and ensure the maximum reuse rate of the equipment,the disassembly of the equipment in the tunnel also needs to be carried out in a planned and orderly manner after the tunnel is completed.Taking Dongshan water supply No.9 tunnel as an example,the disassembly of equipment in the tunnel is mainly expounded in this paper.
作者 彭花珍 PENG Hua-zhen
出处 《山西水利科技》 2020年第3期40-42,共3页 Shanxi Hydrotechnics
关键词 TBM 隧洞 拆卸 TBM tunnel disassembly
作者简介 彭花珍(1984-),男,2012年毕业于河北工程大学,工程师。
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部