摘要
                
                    目前,国内长大隧洞采用TBM掘进施工的越来越多,这类隧洞施工需在洞内布置专业且复杂的配套设备,用于支持TBM的掘进。因此,在隧洞贯通后洞内设备拆卸也需要有计划、有序地进行,以减少拆卸设备的损伤,保证设备最大程度的重复利用率。文中以东山供水9#隧洞贯通后为例,重点阐述了洞内设备的拆卸。
                
                At present,more and more large tunnels in China adopt TBM tunneling,which requires professional and complex supporting equipment to be arranged in the tunnel to support TBM tunneling.Therefore,in order to reduce the damage of the disassembly equipment and ensure the maximum reuse rate of the equipment,the disassembly of the equipment in the tunnel also needs to be carried out in a planned and orderly manner after the tunnel is completed.Taking Dongshan water supply No.9 tunnel as an example,the disassembly of equipment in the tunnel is mainly expounded in this paper.
    
    
    
    