                    以上海徐家汇中心三期工程为例,对深基坑中隔墙的拆除施工工艺进行了探讨。从中隔墙拆除的主要方法、工艺流程以及在拆除过程中需要注意的事项等方面进行了分析,为今后类似项目提供了参考。
                
                Taking the third phase project of Shanghai Xujiahui center as an example,this paper discusses the demolition construction technology of middle partition wall in deep foundation pit.The main methods,technological process,and matters needing attention in the middle partition wall demolition process are analyzed,which provides reference for similar projects in the future.
    
    
                作者
                    毛俊强
                MAO Junqiang(Shanghai Construction No.1(Group)Co.,Ltd.,Shanghai 200120,China)
     
    
    
                出处
                
                    《建筑施工》
                        
                        
                    
                        2020年第8期1381-1382,1385,共3页
                    
                
                    Building Construction
     
    
                关键词
                    深基坑
                    中隔墙拆除
                    工艺流程
                    质量控制
                
                        deep foundation pit
                        middle partition wall removal
                        technological process
                        quality control
                        safety
                
     
    
    