期刊文献+

工程测量在预应力混凝土连续刚构桥挂篮施工中的应用 被引量:4

Application of Engineering Survey in Construction of Prestressed Concrete Continuous Rigid Frame Bridge
在线阅读 下载PDF
导出
摘要 工程测量是桥梁施工中的重要技术工作之一,对工程的质量、进度与安全有决定性作用。以构皮滩的昌湾大桥为实例,在预应力混凝土连续刚构桥的挂篮施工过程中,分别探讨中轴线的控制、挂篮变形的控制以及预应力管道定位等工程难题的解决办法,对类似桥梁工程的施工提供参考。 Engineering survey is one of the important technical work in bridge construction.And it plays a decisive role in the quality,construction progress and safety in the project.This article takes the Changwan Bridge of Goupitan as an example.The solutions to the engineering problems such as the control of central axis,the deformation control of guyed travelers and the positioning of prestressed pipe are discussed in the construction of prestressed concrete continuous rigid frame bridge with the method of guyed travelers.The research results provide references for the construction of similar bridge projects in the future.
作者 许贵满 韩海娅 Xu Guiman;Han Haiya
出处 《江苏建材》 2020年第4期43-45,共3页 Jiangsu Building Materials
关键词 工程测量 预应力连续刚构桥 挂篮 线型控制 施工应用 engineering survey PC continuous rigid frame bridge guyed travelers geometric control construction application
作者简介 第一作者:许贵满(1986-),男,硕士研究生,讲师,土木工程力学应用专业。
  • 相关文献

参考文献4

二级参考文献28

共引文献26

同被引文献17

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部