摘要
较为详细地阐述了地质测绘工程施工方案设计编写的流程及要点,结合当前的测绘设备以及使用的各种测绘规范、预算标准,就如何编写进行了分析说明,对在编制过程中可能遇到的问题提出解疑,对以后的地质测绘工程施工方案设计的编写具有一定的参考意义。
The process and key points of the design and compilation of the construction plan of geological surveying and mapping engineering are described in detail,and how to compile the plan is analyzed in combination with the current surveying and mapping equipment and various surveying and mapping specifications and budget standards,and the possible problems encountered in the compilation process are solved.It has certain reference significance to the compilation of the construction scheme design of geological surveying and mapping engineering in the future.
作者
赵惠德
ZHAO Hui-de(Shanxi Institute of Geological Survey,Taiyuan 030000,China)
出处
《工程建设与设计》
2020年第16期61-62,共2页
Construction & Design for Engineering
关键词
控制网
精度评定
限差
control network
accuracy evaluation
limit
作者简介
赵惠德(1970-),男,山西原平人,高级工程师,从事地质测绘研究。